Search
Now showing items 1-10 of 39
Analisis Pendugaan Limpasan di Perumahan Tamansari Persada, Bogor
(2013)
Runoff is affected by various factors, i.e., meteorological factor represented by precipitation and regional flow factor stated the regional drainage physical properties. The change in land characteristics from natural ...
Analisis Inventarisasi Pemodelan Komponen Superstructures Jembatan Cikujang Menggunakan BIM Tekla Structures
(2013)
Modeling is a plan that describes an object, a system, a concept of idealization. Modeling in the planning phase of construction was carried on to produce DED and As Built Drawing. Inventory management is a process for ...
Analisis Korelasi antara Bangkitan Debu Jatuh, Kecepatan Angin, dan Kadar Air Tanah
(2013)
Naturally dustfall can be generated from dry soil that carried away by the wind. The aim of the research is to analyze the correlations between dustfall, wind speed, and soil moisture content on three main types of soil ...
Analisis dan Evaluasi Struktur Atas Tower C Grand Center Point Apartement Terhadap Beban Gempa Berdasarkan Peta Gempa Indonesia 2010
(2013)
Indonesia is a very vulnerable country against earthquakes because of it is located between three active earth slabs like Pacific, Indo-Australian, and Eurasia. The number of volcanoes also make Indonesia become vulnerable ...
Evaluasi dan Desain Peningkatan Kapasitas Instalasi Pengolahan Air Minum di PT. Krakatau Tirta Industri
(2013)
PT. Krakatau Tirta Industri (PT KTI) has a rule as supplier of Cilegon Municipality’s water needs. Considering the demand for water supply continues to grow, PT. KTI intends to increase its capacity up to 2500 liters/sec. ...
Penentuan Lokasi, Luas, dan Volume Genangan Air Sebagai Potensi Cadangan Airtanah di Perumahan Tamansari Persada, Bogor
(2013)
The changes of the green land-use as retention area to become housing area, will cause problems like enhancement of run-off, reduction of water infiltration to the land, as well as puddle and flood if water volume increases ...
Perencanaan Sistem Penyaluran Air Limbah Laboratorium di Kampus IPB Dramaga, Bogor
(2013)
Waste are emissions that resulted from an industrial production processes or domestic, that not environmentaly wanted and does not have economic value. This study aimed to determine the laboratory wastewater discharge and ...
Analisis Up Take Kandungan Logam Berat dari Kompos Lumpur Water Treatment Plant oleh Tanaman.
(2013)
Utilization of sludge processing results are very minimal and less noticed by many among the industry. This research aims to identify the feasibility of compost of sludge processing drinking water as a medium for planting, ...
Rancangan Unit Instalasi Pengolahan Air Limbah dengan Pengolahan Biologis Attached Growth
(2013)
Industrial development in Indonesia, cause negative impact on environment, such as water pollution. One way to overcome this problem is by developing wastewater treatment plant (WWTP). However not all industries have WWTP, ...
Kajian Efektivitas Penerapan Sistem Manajemen Lingkungan ISO 14001 di PT. Indocement Tunggal Prakarsa, Tbk. Citeureup, Bogor
(2013)
PT. Indocement Tunggal Prakarsa. (ITP) Tbk. Cietureup, Bogor has implemented ISO 14001 since September 2002 and still retain such accreditation. The objective of this study was to determine the effectiveness of the ...