Analisis Inventarisasi Pemodelan Komponen Superstructures Jembatan Cikujang Menggunakan BIM Tekla Structures
View/ Open
Date
2013Author
Nugraha, Dhimas Bagus
Raimadoya, Machmud Arifin
Metadata
Show full item recordAbstract
Modeling is a plan that describes an object, a system, a concept of idealization. Modeling in the planning phase of construction was carried on to produce DED and As Built Drawing. Inventory management is a process for goods and materials in order to arranged and organized (Basri 2004). Inventory of the construction is the main thing, especially in managing the state owned construction such as roads and bridges, because it affects to the financing of infrastructure. Inventory conducted on the construction is to examine in detail the modeling of structural components. In this research, the component inventory is done to upper structure (superstructures) Cikujang bridge in Tasikmalaya regency using application based Tekla Structures BIM (Building Information Modeling). The purpose of this research is to do modeling and inventory of Cikujang bridge superstructures to get a BIM with PID method or integrated project management. This is done because there is unavailable of modeling information Cikujang bridge superstructures components are detailed. The results obtained in the form of 3D BIM modeling and detail superstructure components are detailed, and the total use of superstructures components inventory reached 618 units. Efficient use of material components by type is presented in the form of a percentage. The steel material is the most numbers of material, reaching 87.540%. With BIM inventory and presentation obtained information of Cikujang bridge superstructures are detailed and proportioned.