View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Civil and Environmental Engineering
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Civil and Environmental Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Rancangan Hidrolika Bangunan Pengendali Limpasan di Wilayah Kampus IPB Dramaga, Bogor

      Thumbnail
      View/Open
      Abstract (366.0Kb)
      BAB I (361.4Kb)
      BAB II (585.4Kb)
      BAB III (384.8Kb)
      BAB IV (1.281Mb)
      BAB V (359.6Kb)
      Cover (294.5Kb)
      Daftar Pustaka (339.3Kb)
      full text (2.057Mb)
      Lampiran (706.3Kb)
      Date
      2012
      Author
      Rossi, Joan Kartini
      Pandjaitan, Nora H.
      Prastowo
      Metadata
      Show full item record
      Abstract
      Bogor Agricultural University (IPB) stage III physical development is being implemented since 2011. Along with those development, the surface run-off was increased. The aim of these research were (1) to determine ECC-based on water balance, (2) to predict run-off (3) to do hydraulics design of runoff control structure. Based on water balance, environmental carrying capacity (ECC) was analysed, while run-off in IPB campus Dramaga was calculated by the rational method. Hydraulics design of run-off control structure was obtained by trial and error. The region can be divided into 14 catchment area (CA). The ratio of water availability and water demand was 0,9 hence the ECC of IPB Campus Dramaga was overshoot. Total discharge runoff to Campus IPB Dramaga was 5.66 m3/s. Discharge run-off in each CA was about 0.05 to 1.45 m3/s. Run-off control structure was needed to collect surfacerun-off hence increase water availability. Considering the topography and landuse, land and water conservation was needed in CA 4 and CA 9. CA 4 was suitable for reservoir which supported with sediment trap and drainage channel. CA 9 needed sediment trap for each inlet of Situ Leutik and bigger drainage holes along the side street.
      URI
      http://repository.ipb.ac.id/handle/123456789/57951
      Collections
      • UT - Civil and Environmental Engineering [734]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository