View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Agricultural and Biosystem Engineering
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Agricultural and Biosystem Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Kajian waktu kerja dan produktivitas pada proses perakitan mobil avanza trimming 0 di PT. Toyota Motor Manufacturing Indonesia

      Thumbnail
      View/Open
      Full text (2.199Mb)
      Cover (294.8Kb)
      Abstract (293.3Kb)
      BAB I (288.2Kb)
      BAB II (412.3Kb)
      BAB III (445.2Kb)
      BAB IV (929.6Kb)
      Kesimpulan (285.6Kb)
      Daftar Pustaka (357.3Kb)
      Lampiran (1.816Mb)
      Date
      2011
      Author
      Priyambodo, Yudistia Rizkiangga
      Darmawati, Emmy
      Gatot, Subchan
      Metadata
      Show full item record
      Abstract
      Assessment of work time and productivity should be done routinely by a company. One of the aims is to monitor whether the standard work time can still be used or need adjustment. This is important since PT. Toyota Motor Manufacturing Indonesia, the Indonesia's largest automotive company, has a high production target of 150,000 units of vehicles per year. Assessment of work time begins with the measurement of actual work time. From the measurement of actual working time, normal time and standard time for each activities were then caculated. Afterward, the utilization rate of time and productivity were calculated from the existing standard time and from the calculated standard time. In measurement of work time for preparations of RR Axle Avanza in Trimming 0 activities, Assembly Production Department in Karawang Plant, it was found that the operator had a 71 seconds lack time from 15 activities, while having 202 seconds remaining time from 22 activities. The utilization rate the existing standard time was 73,53% and the productivity was 7,27 units/hour. After the calculation of new standard time, it was obtained that the utilization rate was 87,3% and the productivity was 8,63 unit/hour with 53 seconds unutilized time and no lack time. This shows that the new standard time can be used as a guidance for preparations of RR Axle Avanza activities.
      URI
      http://repository.ipb.ac.id/handle/123456789/51387
      Collections
      • UT - Agricultural and Biosystem Engineering [3592]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository