IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Master Final Assignments
      • MF - Business
      • View Item
      •   IPB Repository
      • Final Assignments
      • Master Final Assignments
      • MF - Business
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analisis Aliran Produksi Simulator dan Identifikasi Waste menggunakan Value Stream Mapping (VSM) di Racelab Sim Racing

      Thumbnail
      View/Open
      Cover (865.8Kb)
      Fulltext (1.991Mb)
      Lampiran (406.1Kb)
      Date
      2026
      Author
      Ramadhani, Alif Akbar
      Indrawan, Raden Dikky
      Safari, Arief
      Metadata
      Show full item record
      Abstract
      Racelab Sim Racing merupakan perusahaan yang bergerak dalam bidang manufaktur simulator balap (racing simulator) yang melayani kebutuhan pelanggan individu, komunitas, perusahaan, hingga institusi pendidikan. Seiring dengan meningkatnya permintaan pasar, perusahaan menghadapi tantangan dalam menjaga konsistensi waktu penyelesaian produksi. Variasi waktu produksi yang terjadi pada beberapa tahapan proses menyebabkan ketidakpastian waktu produksi dan berpotensi mengurangi efisiensi operasional perusahaan. Kondisi tersebut mendorong perlunya evaluasi terhadap alur produksi guna mengidentifikasi aktivitas yang tidak memberikan nilai tambah (non-value-added activities) serta menemukan peluang perbaikan proses. Penelitian ini bertujuan untuk menganalisis kondisi aktual proses produksi simulator di Racelab Sim Racing, mengidentifikasi waste dan bottleneck yang terjadi dalam aliran produksi, serta merumuskan usulan perbaikan untuk meningkatkan efisiensi proses produksi. Penelitian dilaksanakan di Racelab Sim Racing pada periode Juli 2024 hingga Maret 2026 dengan menggunakan pendekatan studi kasus. Data yang digunakan terdiri atas data primer yang diperoleh melalui observasi langsung serta data sekunder yang berasal dari catatan historis produksi perusahaan. Metode utama yang digunakan dalam penelitian ini adalah Value Stream Mapping (VSM) untuk memetakan aliran material dan informasi mulai dari penerimaan pesanan hingga produk selesai diproduksi (finished good). Analisis VSM didukung oleh Fishbone Diagram dan 5 Why Analysis untuk mengidentifikasi akar penyebab terjadinya keterlambatan produksi. Data yang dianalisis meliputi waktu proses pada setiap tahapan produksi, yaitu aluminium profile cutting, laser and bending plate, painting, seat upholstery, seat livery decal, dan frame assembly, serta total waktu produksi (production time) pada periode Oktober 2023 hingga September 2024. Hasil penelitian menunjukkan bahwa proses produksi simulator memiliki rata-rata production time sebesar 12,1 hari dengan variasi waktu produksi antar bulan yang cukup besar, nilai tersebut menunjukkan bahwa rata-rata waktu penyelesaian produksi masih melebihi target perusahaan sebesar 10 hari sehingga diperlukan identifikasi terhadap aktivitas yang menyebabkan keterlambatan. Berdasarkan analisis VSM, proses laser and bending plate teridentifikasi sebagai tahapan yang menjadi bottleneck karena memiliki waktu proses relatif lebih tinggi dibandingkan tahapan lainnya. Selain itu, ditemukan beberapa bentuk waste dalam sistem produksi, terutama waiting time, transportation, dan inventory berupa work in process (WIP) akibat ketidakseimbangan aliran proses akibat ketergantungan terhadap vendor eksternal. Analisis menggunakan Fishbone Diagram dan 5 Why Analysis menunjukkan bahwa akar penyebab utama keterlambatan produksi berasal dari belum optimalnya koordinasi dengan vendor, belum adanya standar waktu penyelesaian yang terukur, serta kurangnya sistem pengendalian terhadap aliran material dan jadwal produksi. Berdasarkan hasil analisis, usulan perbaikan yang direkomendasikan meliputi peningkatan koordinasi dengan vendor, penyusunan sistem penjadwalan produksi yang lebih terintegrasi, optimalisasi aktivitas yang dapat dilakukan secara paralel, serta penerapan future state Value Stream Mapping sebagai acuan perbaikan proses di masa mendatang. Implementasi usulan tersebut diharapkan mampu mengurangi waste, memperlancar aliran produksi, menurunkan production time, dan meningkatkan efisiensi operasional perusahaan.
       
      Racelab Sim Racing is a company engaged in the manufacturing of racing simulators for individual customers, communities, corporations, and educational institutions. As market demand continues to increase, the company faces challenges in maintaining production completion consistency. Variations in processing times across several production stages create uncertainty in production time and potentially reduce operational efficiency. This condition highlights the need to evaluate the production flow in order to identify non-value-added activities and determine opportunities for process improvement. This study aims to analyze the current condition of the simulator production process at Racelab Sim Racing, identify waste and bottlenecks within the production flow, and formulate improvement recommendations to enhance production efficiency. The research was conducted at Racelab Sim Racing from July 2024 to March 2026 using a case study approach. Primary data were obtained through direct observation and interviews, while secondary data were collected from the company's historical production records. The main method applied in this study was Value Stream Mapping (VSM), which was used to map material and information flows from order receipt to finished goods. The VSM analysis was supported by Fishbone Diagram and 5 Why Analysis to identify the root causes of production delays. The analyzed production stages included aluminium profile cutting, laser and bending plate, painting, seat upholstery, seat livery decal, and frame assembly, along with total production time from October 2023 to September 2024. The results indicate that the simulator production process has an average production time of 12.1 days, with considerable monthly variations. Based on the VSM analysis, the laser and bending plate process was identified as a potential bottleneck due to its relatively longer processing time compared to other stages. Furthermore, several forms of waste were identified, particularly waiting, transportation, and process flow imbalances caused by dependence on external vendors. The Fishbone Diagram and 5 Why Analysis revealed that the primary causes of production delays were inadequate vendor coordination, the absence of measurable completion standards, and insufficient control over material flow and production scheduling. Based on the findings, several improvement recommendations are proposed, including enhancing vendor coordination, developing a more integrated production scheduling system, optimizing parallel activities, and implementing a future-state Value Stream Mapping model as a guideline for continuous improvement. These improvements are expected to reduce waste, improve production flow, shorten production time, and increase overall operational efficiency.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/180306
      Collections
      • MF - Business [4197]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository