IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Faculty of Agricultural Technology
      • UF - Civil and Environmental Engineering
      • View Item
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Faculty of Agricultural Technology
      • UF - Civil and Environmental Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Perencanaan Sistem Pemanenan Air Hujan di Masjid Al Hurriyyah Kampus IPB Dramaga

      Thumbnail
      View/Open
      Cover (434.9Kb)
      Fulltext (1.226Mb)
      Lampiran (318.3Kb)
      Date
      2026
      Jenis/Type
      Skripsi
      Author
      Fadhil, Hanif Muhammad
      Setiawan, Budi Indra
      Metadata
      Show full item record
      Abstract
      Tingginya kebutuhan air wudhu jamaah di Masjid Al Hurriyyah Kampus IPB Dramaga yang mengandalkan air tanah memicu risiko kelangkaan pasokan air saat waktu shalat. Penelitian ini bertujuan menghitung potensi volume air hujan atap, merancang desain, dan menyusun Rancangan Anggaran Biaya (RAB) Sistem Pemanenan Air Hujan (SPAH). Metode penelitian mencakup analisis data curah hujan harian 20 tahun (2006–2025) menggunakan distribusi Weibull, perancangan hidrologi berbasis standar SNI, serta penjelasan dampak ekonomi, sosial, serta lingkungan. Hasil pengujian menunjukkan distribusi Weibull dapat diterima dengan nilai koefisien determinasi sebesar 0,9861 dan potensi air hujan terpanen mencapai 4.651,7 m3/tahun. Sistem memanfaatkan pipa vertikal eksisting 4 inci dan pipa vertikal tambahan 5 inci, modifikasi pipa horizontal PVC 5 dan 6 inci dengan kemiringan 1%, serta tangki penyimpanan FRP berkapasitas 24 m3. Total modal pengadaan sistem sebesar Rp153 juta dengan biaya pengeluaran tahunan Rp5 juta. Sistem ini memiliki efektivitas pemenuhan 76% kebutuhan air tahunan (2.078 m3). Implikasi penerapan SPAH secara konkrit mampu menjamin stabilitas pasokan air wudhu jamaah sekaligus mereduksi limpasan permukaan yang memicu genangan di sekitar area masjid.
      URI
      http://repository.ipb.ac.id/handle/123456789/173657
      Collections
      • UF - Civil and Environmental Engineering [1138]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository