| dc.contributor.advisor | Sapei, Asep | |
| dc.contributor.advisor | Pandjaitan, Nora Herdiana | |
| dc.contributor.author | Harits, Muzhaffar | |
| dc.date.accessioned | 2024-12-04T13:20:16Z | |
| dc.date.available | 2024-12-04T13:20:16Z | |
| dc.date.issued | 2024 | |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/159610 | |
| dc.description.abstract | Kebutuhan air di Kebun Penelitian dan Pendidikan IPB Jonggol pada umumnya dipenuhi dengan memanfaatkan curah hujan. Jika hanya mengandalkan curah hujan saja, maka akan terjadi kekurangan air dalam jangka waktu tertentu, sehingga diperlukan pembangunan bangunan air seperti embung. Penelitian ini bertujuan untuk merancang embung di Kebun Penelitian dan Pendidikan IPB Jonggol, menganalisis neraca air embung yang dibangun, dan menghitung rencana anggaran biaya pembangunan embung. Embung yang direncanakan diperuntukkan untuk pabrik pengolahan kelapa sawit dengan total kebutuhan air sebesar 8.786 m³ pada musim kemarau. Analisis debit andal dilakukan dengan menggunakan Soil Water Assessment Tools (SWAT), sedangkan analisis debit banjir menggunakan metode rasional. Perhitungan kapasitas embung sebagai cadangan air permukaan didasarkan pada ketersediaan air, kebutuhan air, volume sedimen, dan juga total penguapan. Lokasi embung yang paling sesuai ditetapkan pada koordinat 107° 2' 10.53" Bujur Timur dan 6° 28' 17.60" Lintang Selatan. Embung ini memiliki luas muka air normal (MAN) 7.737,19 m² dengan kedalaman muka air normal 3 meter, dan total volume tampungan 9.947,76 m³. Karakteristik embung meliputi saluran luapan, saluran intake, dan tanggul embung. Simulasi neraca air menunjukkan bahwa embung akan mulai terisi pada bulan Februari dan penuh pada bulan Maret sampai Mei. Setelah itu, neraca air akan berulang secara konstan sehingga dapat disimpulkan embung mampu memenuhi kebutuhan air di lokasi. Total biaya yang dibutuhkan untuk membangun embung tersebut adalah Rp1.022.400.000. | |
| dc.description.abstract | The water requirements at the IPB Education and Research Garden Jonggol was usually fulfilled by utilizing rainfall. If we rely only on rainfall, there will be a water shortage for a certain period of time, so building water structures such as pond or embung is necessary. This research aimed to design the embung at the IPB Education and Research Garden Jonggol, analyze the water balance of the embung that was built, and calculate the budget plan. The planned embung is intended for the palm oil processing plant with a total water requirement of 8,786 m3 during the dry season. Dependable discharge analysis was conducted using Soil Water Assessment Tools (SWAT), while flood discharge analysis employed the rational method. Small dam capacity calculation as a surface water reserve was based on water availability, water demand, sediment volume, and also the total of evaporation. The most suitable location for the small dam was identified at coordinates 107° 2' 10.53" East Longitude and 6° 28' 17.60" South Latitude. It features a normal water surface area (MAN) of 7,737.19 m² with a normal water level depth of 3 meters, and a total storage volume of 9,947.76 m³. The embung characteristics include the overflow channel, intake channel, and embung embankment. The water balance simulation indicated that embung will start filling in February and be full from March to May.After that, the water balance will continue to repeat consistently so that it can be concluded that the embung can meet the water needs at the location. The total cost required to build the embung is Rp1,022,400.000 | |
| dc.description.sponsorship | | |
| dc.language.iso | id | |
| dc.publisher | IPB University | id |
| dc.title | Desain Embung Di Kebun Pendidikan Dan Penelitian IPB Jonggol Kabupaten Bogor | id |
| dc.title.alternative | Embung Design at the IPB Education and Research Garden Jonggol Bogor Regency | |
| dc.type | Tesis | |
| dc.subject.keyword | kebutuhan air | id |
| dc.subject.keyword | kelapa sawit | id |
| dc.subject.keyword | SWAT | id |
| dc.subject.keyword | debit andalan | id |
| dc.subject.keyword | kapasitas tampung | id |