Analisis Kinerja Waktu Pada Proyek Pembangunan Gedung Perpustakaan Dengan Menggunakan Metode Jalur Kritis (Studi Kasus : Proyek X Oleh PT. ABC)
(2012)
Construction in Indonesia is still continuing to meet a range of facilities required. In the implementation of a project, there are some aspects that should be concern, such as limited time, cost, and good in quality and ...
Analisis Struktur Box Girder Jembatan Fly Over Rawabuaya Sisi Barat Terhadap Gempa
(2012)
The Rawabuaya flyover bridge is the solution that is offered by the local government to overcome the traffic jam that often happens in the Rawabuaya area. It has an extremely vital function to disentangle the traffic ...
Analisis Debit Sungai Dengan Menggunakan Model SWAT Pada DAS Cipasauran, Banten
(2012)
Total water demand at non industrial and industrial region in Cilegon is increasing. With its water production capacity of 2,000 lt/s, PT Krakatau Tirta Industri can't fulfill the amount number of demand from all sectors ...
Analisis Pendugaan Limpasan di Perumahan Tamansari Persada, Bogor
(2013)
Runoff is affected by various factors, i.e., meteorological factor represented by precipitation and regional flow factor stated the regional drainage physical properties. The change in land characteristics from natural ...
Analisis Inventarisasi Pemodelan Komponen Superstructures Jembatan Cikujang Menggunakan BIM Tekla Structures
(2013)
Modeling is a plan that describes an object, a system, a concept of idealization. Modeling in the planning phase of construction was carried on to produce DED and As Built Drawing. Inventory management is a process for ...
Structural Analysis Apartment Grand Emerald Building Kelapa Gading North Jakarta Use Earthquake Map 2002 With Static Equivalent AnalysisAnalisis Struktur Bangunan Apartemen Grand Emerald, Kelapa Gading, Jakarta Utara menggunakan Peta Gempa 2002 dengan Analisis Statik Equivalent
(IPB ( Bogor Agricultural University ), 2012)
Structure calculation is an important step in the beginning of building planning. One of the instruments that can be used to do structure analysis in a fast and precise way is ETABS v 9.0.7. The instruments that used in ...
Pemanfaatan limbah lumpur water treatment plant PT. Krakatau Tirta Industri sebagai bahan baku komposUtilization of PT. Krakatau Tirta Industri water treatment plant sludge as compost raw materials
(IPB ( Bogor Agricultural University ), 2012)
Sludge is the residue from sedimentation process which is settled in the bottom of clarifier unit. Accumulated sludge inside the sludge drying bed could be discarded using some methods. Composting is one of the alternative ...
Study on Headloss in Pipe Distribution of PDAM Tirta Pakuan Water Supply NetworkMempelajari Kehilangan Head pada Pipa Distribusi Jaringan Suplai Air Bersih PDAM Tirta Pakuan
(IPB ( Bogor Agricultural University ), 2012)
Headloss is energy loss from friction in pipeline caused by pipe wall friction and the viscous dissipating in flowing water. Headloss was differentiated as two type i.e., major losses and minor losses. Major losses is ...
River Discharge Analysis of Saba Watershed Using MW-SWATAnalisis Debit Aliran Sungai DAS Saba dengan Menggunakan MW-SWAT
(IPB ( Bogor Agricultural University ), 2012)
Saba is one of watershed that located in Buleleng, Bali. Length of Saba river is about 36 km. Saba river flows through Buleleng region which is relatively dried. Saba watershed is one of water supplier for irrigate agriculture ...
Analisis Korelasi antara Bangkitan Debu Jatuh, Kecepatan Angin, dan Kadar Air Tanah
(2013)
Naturally dustfall can be generated from dry soil that carried away by the wind. The aim of the research is to analyze the correlations between dustfall, wind speed, and soil moisture content on three main types of soil ...