dc.contributor.authorSuhendra, Dede Ida
dc.date.accessioned2010-04-27T07:11:57Z
dc.date.available2010-04-27T07:11:57Z
dc.date.issued2007
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/8865
dc.description.abstractMining is an effort to remove in situ minerals resources, which is in exploitation stage that employ surface mining method is critical, yet mostly close to huge spatial opening, therefore suitable planning and operation is required to synchronize both of economical and environmental interests. Due to the prudent principle of the Government on a mining company, by regardless its principal and scale, the company is obliged to insure any spatial opening during their operation period by allocating appropriate fund in a certain Bank, as Reclamation Bond. Determining the Reclamation Bond needs both skill and expertise, otherwise it would consume time, even perfunctorily. Dealing with the necessity of Reclamation Bond assessment tool, this study attempted to develop a decision support system (DSS) approach to support fast and objective problem solution for evading disputability. The objective of this project is to develop a Mining Rehabilitation Bond System, which can provide the additional tool for the Government as Decision Support System to evaluate any company planning concerning cost estimation either suitable or not to be agreed with, determining adequate amount direct cost and indirect cost and emphasizing mine stakeholder awareness of any decision support related to cost of mining reclamation activity The Mining Rehabilitation Bond System is designed to support decision making, in order to minimize DSS implementation, data base manipulation through Visual Basic programming language. Beside direct cost analysis and indirect cost analysis, there is also manual analysis to perform additional data for structure demolition calculation and earth moving activities. The main focus of this system design is to estimate the amount of escalation per year that have to meet mining company’s reclamation cost planning. Based on the result, the combination of DSS Tool and reclamation formula can produce application system for rehabilitation bond. This calculation system is used to evaluate Reclamation Bond for 5 (five) years and annual reclamation cost based on direct and indirect cost of reclamation activity. This application tries to attempt evaluating system of mining company’s reclamation data. The application system has several weaknesses such as haul distance and grade consideration that should be measured manually, need socialization to mining company association and never published yet. The Mining Rehabilitation Bond System still needs to be tested for knowing its performance including its database system through several data from company (KK, KP and PKP2B) and the calculation of haul distance and grade of equipment needs digital input using spatial approach or digital map digitizer.id
dc.publisherIPB (Bogor Agricultural University)
dc.subjectBogor Agricultural University (IPB)id
dc.subjectMining Areaid
dc.subjectReclamation Acitivityid
dc.subjectReclamation’s Direct Costid
dc.subjectReclamation’s Indirect Costid
dc.subjectRehabilitation Bond Applicationid
dc.subjectDatabaseid
dc.subjectImplementationid
dc.titleDecision Support System for Rehabilitation Bond of Mining Areaid