Show simple item record

dc.contributor.advisorPurwanto, M. Yanuar Jarwadi
dc.contributor.authorWicaksono, Panji Prasetyo
dc.date.accessioned2014-12-03T04:37:29Z
dc.date.available2014-12-03T04:37:29Z
dc.date.issued2014
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/70756
dc.description.abstractPabrik Gula Bungamayang, PT. Perkebunan Nusantara VII is one of the sugar cane plantations that the fulfillment of water use reservoir. There’s problem at Petak 093 Afdeling in Rayon II, where the rain caused reservoir water runoff towards to the inspection so that the path becomes difficult pass. As for the goal of this research is planning a spillway of reservoir design so that the normal storage of reservoir constants. Generally, this research was divided into two steps there were preliminary research (flood discharge analysis) and primary research include the analysis of spillway and open channel. Based on observed and researched at Petak 093 Afdeling 09 Rayon II was gained the 25 years return period of flood discharge is 2.96 m3/s by means of used a double circular culvert each 0.80 m of diameter with a space of 0.40 m. Then the flow of water that pass through the culvert continued toward to the 1.85 m of open channel and 4.70 × 2.00 m of basin.en
dc.language.isoid
dc.subject.ddcbunga Mayang-Lampung Utaraen
dc.subject.ddc2014en
dc.subject.ddcSmall DAMen
dc.subject.ddcCivil Engineeringen
dc.titlePerencanaan Bangunan Pelimpah pada Embung di Perkebunan Bungamayang PT. Perkebunan Nusantara VIIen
dc.subject.keywordcircular culverten
dc.subject.keywordsmall damen
dc.subject.keywordflood dischargeen
dc.subject.keywordspillwayen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record