IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Dissertations
      • DT - Agriculture Technology
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Dissertations
      • DT - Agriculture Technology
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Preventive maintenance and inventory of spare part for production equipment in palm oil mill kertajaya

      Pemeliharaan pencegahan dan persediaan suku cadang untuk peralatan produksi di pabrik pengolahan kelapa sawit kertajaya

      Thumbnail
      View/Open
      Fultext (2.226Mb)
      Date
      2013
      Author
      Hasanah, Ina Siti
      Machfud
      Sukardi
      Hambali, Erliza
      Metadata
      Show full item record
      Abstract
      Plant maintenance undertaken at PKS Kertajaya is a system breakdown maintenance and preventive maintenance. Preventive maintenance is not carried out when the fresh fruit bunches processed a lot, so there will be breakdown maintenance. PKS Kertajaya does not have its own inventory concept in determining the amount of spare parts inventory. Reservation made based on estimates only based on the demand that has happened. The purpose of this study is to formulate the scheduling preventive maintenance on production equipment maintenance scheduling in a palm oil mill with an optimal cost of maintenance, to determine spare parts inventory by the number of low demand. This study conducted to get performance of production equipment maintenance using Overall Equipment Effectiveness, identifying and prioritizing equipment factory production by using Failure Mode and Effect Analysis, schedule preventive maintenance of production equipment with a total cost of optimal maintenance and spares inventory planning using the model of Economic order Quantity where demand assumed poisson distribution. Results of performance of equipment maintenance using Overall Equipment Effectiveness indicates that maintenance scheduled at a palm oil mill. Results of the Failure Mode and Effect Analysis is the ranking value Risk Priority Number to 30 components scheduled. Results of factory production equipment maintenance scheduling of oil palm is scheduling maintenance for 30 components with optimal charge at 51% level of reliability and can save as much as 17,5% of the cost without doing preventive maintenance. Results of spare parts planning is optimal total inventory cost.
      URI
      http://repository.ipb.ac.id/handle/123456789/66804
      Collections
      • DT - Agriculture Technology [665]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository