Desain Kapasitas Produksi Listrik Berdasarkan Debit Andalan Berkelanjutan di Daerah Aliran Sungai Cidanau.
Abstract
Planning development Project of Micro Hydro Power (PMHP) is one of the important thing in the allocation of water resources in rural areas. Planning PMPH observed located in Kubang Baros Village, Serang District, Banten. In planning PMPH, besides planning design capacity of the production electricity, need to know the condition of existing allocation of water resources in the upstream areas. Allocation of water resources accounted by predict water demand for region subdistrict Cinangka, Padarincang and Ciomas in 2050. Calculation water needs aims to the amount of water available can sustain to be used in a long time. So, the allocation for water resources can be run in sustainable and stable. Based on the results of the study determined that the Cidanau Watershed produce reliability discharge equal to 3.51 m3/sekon, with a prediction of water requirement in 2050 is 2.1 m3/sekon. The conclusion for this planning design of electrical production capacity produces electrical power equal to 387.91 kW.