Show simple item record

dc.contributor.advisorBakhtiar, Toni
dc.contributor.advisorHanum, Farida
dc.contributor.authorSavitri, As Syifa
dc.date.accessioned2026-08-10T00:57:20Z
dc.date.available2026-08-10T00:57:20Z
dc.date.issued2026
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/177937
dc.description.abstractPerencanaan produksi merupakan kegiatan penting untuk menjaga keseimbangan antara permintaan dan ketersediaan produk. Pada unit usaha parfum yang diteliti, perencanaan produksi masih dilakukan secara manual sehingga berpotensi menyebabkan ketidaksesuaian antara jumlah produksi, penggunaan anggaran, dan ketersediaan persediaan. Penelitian ini bertujuan memodelkan dan menyelesaikan permasalahan perencanaan produksi menggunakan fuzzy goal programming (FGP). Parameter permintaan diperoleh melalui proses peramalan menggunakan metode Random Forest berdasarkan data historis penjualan tahun 2025. Hasil peramalan digunakan sebagai parameter dalam model FGP yang mempertimbangkan sasaran memaksimumkan profit, mengendalikan penggunaan anggaran, dan mempertahankan safety stock. Model diselesaikan menggunakan bantuan perangkat lunak Python. Hasil implementasi menunjukkan bahwa model FGP mampu menghasilkan rencana produksi yang memenuhi sasaran unit usaha tanpa menimbulkan inventori negatif yang berpotensi menyebabkan stockout.
dc.description.abstractProduction planning is essential for maintaining a balance between product demand and availability. In the perfume business unit studied, production planning is still conducted manually, which may lead to mismatches between production quantity, budget utilization, and inventory availability. This study aims to model and solve a production planning problem using the fuzzy goal programming (FGP) method. Demand parameters were obtained through a forecasting process using the Random Forest method based on historical sales data from 2025. The forecasting results were used as input parameters in the FGP model, which considers the objectives of maximizing profit, controlling budget utilization, and maintaining safety stock levels. The model was solved using Python software. The implementation results show that the FGP model is capable of generating a production plan that satisfies the company's objectives without creating negative inventory levels that could potentially lead to stockouts.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titleOptimasi Perencanaan Tingkat Produksi Menggunakan Fuzzy Goal Programmingid
dc.title.alternativeOptimization of Production Level Planning Using Fuzzy Goal Programming
dc.typeSkripsi
dc.subject.keywordfuzzy goal programmingid
dc.subject.keywordoptimasi produksiid
dc.subject.keywordperencanaan produksiid
dc.subject.keywordrandom forestid
dc.subtypeProject > Case Studies


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record