Show simple item record

dc.contributor.advisorIndrawan, Purana
dc.contributor.authorFadhil, Muhammad
dc.date.accessioned2026-08-07T10:04:55Z
dc.date.available2026-08-07T10:04:55Z
dc.date.issued2026
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/177712
dc.description.abstractPenelitian ini dilatarbelakangi oleh belum optimalnya efektivitas Mesin Tsugami 7 pada proses produksi piston rod di PT XYZ. Mesin ini memiliki peran penting dalam proses cutting dan machining, sehingga gangguan mesin dapat berdampak pada downtime dan tidak tercapainya target produksi. Penelitian ini bertujuan untuk mengukur efektivitas mesin menggunakan metode Overall Equipment Effectiveness (OEE), mengidentifikasi faktor kerugian dominan melalui Six Big Losses, serta menganalisis keandalan mesin menggunakan MTBF dan MTTR. Data yang digunakan berasal dari data produksi, downtime, defect, dan mesin trouble periode Januari sampai Maret 2026. Hasil penelitian menunjukkan bahwa nilai rata-rata OEE sebelum usulan sebesar 78,44%, sehingga masih berada di bawah standar world class 85%. Kerugian terbesar berasal dari Breakdown Loss sebesar 8.430 menit atau 42,01%. Nilai MTBF sebelum usulan sebesar 755,76 menit, sedangkan MTTR berbasis downtime sebesar 106,71 menit. Usulan perbaikan yang diberikan meliputi preventive maintenance, Daily Check Sheet, One Point Lesson perawatan mesin, penambahan label spare part, dan One Point Lesson Manajemen Spare part. Setelah usulan diterapkan pada April 2026, nilai rata-rata OEE meningkat menjadi 83,44%. Hasil ini menunjukkan bahwa usulan berdampak positif terhadap efektivitas Mesin Tsugami 7.
dc.description.abstractThis research was motivated by the low effectiveness of the Tsugami 7 machine in the piston rod production process at PT XYZ. This machine plays an important role in cutting and machining activities, so machine failures can increase downtime and affect production target achievement. This study aimed to measure machine effectiveness using the Overall Equipment Effectiveness (OEE) method, identify dominant losses through Six Big Losses, and analyze machine reliability using MTBF and MTTR. The data used in this study consisted of production data, downtime, defect data, and machine trouble records from January to March 2026. The results showed that the average OEE value before improvement was 78.44%, which was still below the world class standard of 85%. The highest loss was Breakdown Loss at 8,430 minutes or 42.01%. The MTBF value before improvement was 755.76 minutes, while the downtime-based MTTR was 106.71 minutes. The proposed improvements included preventive maintenance, a Daily Check Sheet, a One Point Lesson for machine maintenance, spare part labeling, and a One Point Lesson for spare part management. After the improvement was applied in April 2026, the average OEE increased to 83.44%. These results indicate that the proposed improvements had a positive initial impact on the effectiveness of the Tsugami 7 machine.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titleANALISIS EFEKTIVITAS MESIN TSUGAMI 7 MENGGUNAKAN METODE OEE SEBAGAI DASAR PERBAIKAN KINERJA MESIN DI PT XYZid
dc.title.alternativeAnalysis of Tsugami 7 Machine Effectiveness Using the OEE Method as a Basis for Machine Performance Improvement at PT XYZ
dc.typeTugas Akhir
dc.subject.keywordMTBFid
dc.subject.keywordMTTRid
dc.subject.keywordOEEid
dc.subject.keywordSix Big Lossesid
dc.subtypeUndergraduate Theses


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record