dc.description.abstractTata letak Unit Preparasi Pabrik Elemented Detonator PT Dahana masih belum optimal, ditandai dengan jarak perpindahan material yang jauh dan berulang. Berdasarkan data, total jarak tempuh operator mencapai 1.225 meter per siklus, dengan waktu siklus penanganan bahan sebesar 42 menit 5 detik dan ongkos material handling sebesar Rp15.505.556 per bulan. Penelitian ini bertujuan mengevaluasi tata letak existing serta merancang tata letak usulan untuk meningkatkan efisiensi aliran material. Metode yang digunakan meliputi Peta Proses Operasi (PPO), Rectilinear Distance, Activity Relationship Chart (ARC), Total Closeness Rating (TCR), dan perhitungan Ongkos Material Handling (OMH). Hasil penelitian menunjukkan bahwa tata letak usulan mampu mengurangi jarak perpindahan sebesar 547 meter (44,65%), menurunkan waktu siklus penanganan bahan sebesar 1.190 detik (47,13%), serta menekan biaya material handling sebesar Rp576.433 (3,72%). Dengan demikian, tata letak usulan menghasilkan aliran material yang lebih terstruktur sesuai urutan proses produksi dan meningkatkan efisiensi operasional Unit Preparasi.
dc.description.abstractThe layout of the Preparation Unit at the Elemented Detonator Plant of PT Dahana has not yet been optimized, as indicated by long and repetitive material movement distances. Based on the collected data, the operator's total travel distance reached 1,225 meters per production cycle, with a material handling cycle time of 42 minutes and 5 seconds and a monthly material handling cost of IDR 15,505,556. This study aims to evaluate the existing facility layout and develop a proposed layout to improve material flow efficiency. The methods employed include the Operation Process Chart (OPC), Rectilinear Distance, Activity Relationship Chart (ARC), Total Closeness Rating (TCR), and Material Handling Cost (MHC) analysis. The results show that the proposed layout reduced the material movement distance by 547 meters (44.65%), decreased the material handling cycle time by 1,190 seconds (47.13%), and lowered the material handling cost by IDR 576,433 (3.72%). Therefore, the proposed layout provides a more systematic material flow that follows the production sequence and improves operational efficiency in the Preparation Unit.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePerancangan Tata Letak pada Unit Preparasi di Pabrik Elemented Detonator PT Dahanaid
dc.title.alternativeLayout Design for the Preparation Unit at PT Dahana’s Assembled Detonator Plant
dc.typeTugas Akhir
dc.subject.keywordActivity Relationship Chart (ARC)id
dc.subject.keywordEfisiensiid
dc.subject.keywordMaterial handlingid
dc.subject.keywordTata Letak Fasilitasid
dc.subject.keywordTotal Closeness Rating (TCR)id
dc.subject.keywordEfficiencyid
dc.subject.keywordFacility Layoutid