Show full item recordAbstract
Peningkatan permintaan kayu jati mengharuskan optimalisasi pemanenan
sistem kayu pendek, khususnya pada tahap pemotongan cabang (delimbing) yang
menentukan produktivitas. Penelitian ini bertujuan mengukur dan membandingkan
produktivitas kerja antara metode delimbing berurutan dan acak, serta menganalisis
hubungan jumlah langkah kaki dengan waktu standar. Pengumpulan data dilakukan
melalui perekaman video kegiatan delimbing terhadap tiga operator chainsaw di
KPH Cepu untuk mengamati tiga puluh siklus kerja menggunakan metode time
study dan pedometer digital. Hasil penelitian menunjukkan metode berurutan
menghasilkan produktivitas lebih tinggi (19,407 m³/jam) dibanding metode acak
(17,186 m³/jam), meskipun uji-t dua sampel bebas menyatakan perbedaan waktu
standar tidak signifikan secara statistik (P-value = 0,176). Temuan baru
menunjukkan korelasi langkah kaki dan waktu standar pada metode berurutan
bernilai sedang (r = 0,433) karena ritme kerja teratur, sedangkan metode acak
berkorelasi lemah (r = 0,175) akibat akumulasi waktu habis untuk berdiri diam
menjaga keseimbangan tubuh dan mengatasi hambatan lingkungan. Metode
berurutan direkomendasikan sebagai standar operasional guna meningkatkan
efisiensi dan keselamatan kerja. The increasing demand for teak requires optimization of short-timber
harvesting systems, particularly at the delimbing stage, which determines
productivity. This study aims to measure and compare work productivity between
sequential and random delimbing methods, and to analyze the relationship between
the number of footsteps and standard time. Data collection was conducted by video
recording the delimbing activities of three chainsaw operators in the Cepu Forest
Management Unit (KPH Cepu) to observe thirty work cycles using a time study
method and a digital pedometer. The results showed that the sequential method
produced higher productivity (19,407 m³/hour) than the random method (17,186
m³/hour), although a paired t-test indicated that the difference in standard time was
not statistically significant (P-value = 0,176). New findings indicate a moderate
correlation between footsteps and standard time in the sequential method (r = 0,433)
due to a regular work rhythm, while the random method had a weak correlation (r
= 0,175) due to the accumulated time spent standing still to maintain body balance
and overcome environmental obstacles. The sequential method is recommended as
an operational standard to improve work efficiency and safety.