Show simple item record

dc.contributor.advisorSuwarna, Ujang
dc.contributor.authorPUTRI, OKTAVIA AMANDA
dc.date.accessioned2026-08-04T02:21:41Z
dc.date.available2026-08-04T02:21:41Z
dc.date.issued2026
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/176986
dc.description.abstractPeran Hutan Tanaman Industri (HTI) semakin penting mengingat pasokan kayu di hutan alam semakin menurun akibat kegiatan eksploitasi yang terus- menerus. HTI menyediakan alternatif legal agar pasokan kayu tetap berjalan tanpa merusak hutan alam. Pemanenan yang efisien dapat menekan biaya produksi sekaligus menjaga kelestarian tapak hutan. Tahap penyaradan sering dianggap sebagai “bottleneck” karena membutuhkan waktu dan energi paling besar dibanding tahap lainnya. Penelitian ini bertujuan mengetahui produktivitas kegiatan penyaradan metode cut to length (CTL) dan metode tree length (TL) di PT Arara Abadi, serta mengetahui faktor-faktor yang mempengaruhinya. Metode yang digunakan adalah penelitian waktu dengan cara null-stop dan pengambilan video di lapangan. Kegiatan penyaradan dengan metode CTL menggunakan excavator grapple dengan ponton darat dan metode TL dengan menggunakan skidder winch. Produktivitas aktual dihasilkan sebesar 20,68 m³/jam untuk metode CTL dan 60,43 m³/jam untuk metode TL. Dominan pada waktu efektif dengan persentase 92–98% untuk metode CTL, dan 40–96% untuk metode TL.
dc.description.abstractThe importance of Industrial Plantation Forests (HTI) is increasingly evident, given the continued decline in timber supplies in natural forests due to ongoing exploitation. HTI provides a legal alternative to maintain timber supplies without damaging natural forests. Efficient harvesting can reduce production costs while preserving the forest footprint. The skidding stage is often considered a "bottleneck" because it requires the most time and energy among the stages. This study aims to determine the skidding techniques, the productivity of the cut-to-length (CTL) and tree-length (TL) methods at PT Arara Abadi, and to identify the factors that influence them. The methods used were time-series research with a null-stop method and field video recording. Skidding activities using the CTL method used an excavator grapple with a land pontoon, and the TL method used a skidder winch. Actual productivity was 20.68 m³/hour for the cut to length method and 60.43 m³/hour for the TL method. Dominant in effective time, with percentages of 92– 98% for the CTL method and 40–96% for the TL method.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titleAnalisis Produktivitas Penyaradan Metode Cut to Length dan Tree Length di Hutan Tanaman Insdustriid
dc.title.alternativeProductivity Analysis of Extraction Using Cut to Length and Tree Length Methods in Industrial Plantation Forests
dc.typeSkripsi
dc.subject.keywordpenyaradanid
dc.subject.keywordproduktivitasid
dc.subject.keywordwaktu kerjaid
dc.subtypeUndergraduate Theses


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record