Show simple item record

dc.contributor.advisorKartinawati, Annisa
dc.contributor.authorASTUTI, WIJI
dc.date.accessioned2026-07-29T09:18:50Z
dc.date.available2026-07-29T09:18:50Z
dc.date.issued2026
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/176247
dc.description.abstractPT XYZ menghadapi permasalahan pada lini produksi botol PET 1000 ml berupa tingginya reject rate pada proses Stretch Blow Molding (SBM), penumpukan Work in Process (WIP), dan lead time produksi yang panjang. Penelitian ini bertujuan merancang Value Stream Mapping (VSM) untuk mengidentifikasi pemborosan dan menyusun usulan perbaikan sistem produksi. Hasil analisis menunjukkan lead time produksi mencapai 540,32 menit dengan Process Cycle Efficiency (PCE) sebesar 0,060%. Proses SBM teridentifikasi sebagai bottleneck utama dengan nilai Overall Equipment Effectiveness (OEE) sebesar 59,66% dan reject rate 9,41%. Usulan future state meliputi pengurangan waktu aging preform, eliminasi aging botol, relokasi bahan pendukung ke area point-of-use, dan penerapan pull system berbasis kanban. Perbaikan tersebut diproyeksikan menurunkan lead time menjadi 120,32 menit, meningkatkan good output hingga sekitar 13.000 botol per hari, serta memberikan potensi manfaat finansial sebesar Rp2,8 miliar per tahun.
dc.description.sponsorshipPT XYZ faces several issues in its 1000 ml PET bottle production line, including a high reject rate in the Stretch Blow Molding (SBM) process, excessive Work in Process (WIP) inventory, and long production lead time. This study aimed to develop a Value Stream Mapping (VSM) model to identify waste and propose production system improvements. The results showed that the production lead time reached 540.32 minutes with a Process Cycle Efficiency (PCE) of 0.060%. The SBM process was identified as the main bottleneck, with an Overall Equipment Effectiveness (OEE) value of 59.66% and a reject rate of 9.41%. The proposed future state includes reducing preform aging time, eliminating bottle aging, relocating supporting materials to a point-of-use area, and implementing a kanbanbased pull system. These improvements are projected to reduce lead time to 120.32 minutes, increase good output to approximately 13,000 bottles per day, and generate potential financial benefits of around IDR 2.8 billion per year.
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePerancangan Value Stream Mapping untuk Minimasi Waste dan Peningkatan Efisiensi Produksi Botol PET 1000 ml di PT XYZid
dc.title.alternativeDesign of Value Stream Mapping for Waste Minimization and Efficiency Improvement in the Production of 1000 ml PET Bottles at PT XYZ
dc.typeTugas Akhir
dc.subject.keywordbotol PETid
dc.subject.keywordLean Manufacturingid
dc.subject.keywordprocess cycle efficiency (PCE)id
dc.subject.keywordvalue stream mapping (VSM)id
dc.subject.keywordwasteid
dc.subtypeUndergraduate Theses


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record