Show simple item record

dc.contributor.advisorSinaga, Antonya Rumondang
dc.contributor.authorPUTRA, ALDIANSYAH
dc.date.accessioned2026-07-25T02:19:00Z
dc.date.available2026-07-25T02:19:00Z
dc.date.issued2026
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/175782
dc.description.abstractALDIANSYAH PUTRA. Peningkatan Kinerja Mesin press dengan perhitungan Overall Equipment Effectiveness (OEE) di PT XYZ. Dibimbing oleh ANTONYA RUMONDANG SINAGA. Mesin press di PT XYZ mengalami penurunan efektivitas dan kegagalan target produksi akibat tingginya angka downtime. Penelitian ini bertujuan mengukur efektivitas mesin menggunakan metode Overall Equipment Effectiveness (OEE), mengidentifikasi faktor penyebabnya, serta merumuskan usulan perbaikan berbasis Total Productive Maintenance (TPM). Data dikumpulkan melalui observasi, wawancara, dan catatan produksi. Selanjutnya, analisis dilakukan melalui perhitungan nilai OEE (availability, performance, quality), dilanjutkan dengan identifikasi kerugian menggunakan six big losses, diagram Pareto, fishbone, dan why-why analysis. Hasil penelitian menunjukkan bahwa downtime menjadi faktor utama rendahnya efektivitas mesin, yang dipengaruhi oleh aspek mesin, metode kerja, material, dan operator. Sebagai solusi, disusun usulan perbaikan berupa penerapan One Point Lesson (OPL), peningkatan autonomous maintenance, pelatihan operator, serta penguatan budaya 5S dan pilar TPM. Usulan ini diharapkan mampu meminimalkan downtime dan meningkatkan produktivitas mesin secara berkelanjutan.
dc.description.abstractALDIANSYAH PUTRA. Improving Press Machine Performance through the Calculation of Overall Equipment Effectiveness (OEE) at PT XYZ. Supervised by ANTONYA RUMONDANG SINAGA. The press machines at PT XYZ have experienced reduced effectiveness and a failure to meet production targets due to high levels of downtime. This study aims to measure machine effectiveness using the Overall Equipment Effectiveness (OEE) method, identify contributing factors, and formulate improvement proposals based on Total Productive Maintenance (TPM). Data were collected through observations, interviews, and production records. Subsequently, analysis was conducted by calculating OEE values (availability, performance, and quality) and identifying losses using the "Six Big Losses" framework, Pareto charts, fishbone diagrams, and "Why-Why" analysis. The results indicate that downtime is the primary factor behind the low machine effectiveness, influenced by aspects related to machinery, work methods, materials, and operators. Proposed solutions include implementing One Point Lesson (OPL) programs, enhancing autonomous maintenance, conducting operator training, and strengthening the 5S culture and TPM pillars. These proposals are expected to minimize downtime and sustainably improve machine productivity.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePeningkatan Kinerja Mesin Press dengan Perhitungan Overall Equipment Effectiveness (OEE) di PT XYZid
dc.title.alternativeImproving Press Machine Performance Using Overall Equipment Effectiveness (OEE) Calculations at PT XYZ
dc.typeTugas Akhir
dc.subject.keywordDowntimeid
dc.subject.keywordOne Poin Lessonid
dc.subject.keywordOverall Equipment Effectiveness (OEE)id
dc.subject.keywordpress machineid
dc.subject.keywordTotal Productive Maintenance (TPM)id
dc.subtypeUndergraduate Theses


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record