Show simple item record

dc.contributor.advisorParamitadevi, Yudith Vega
dc.contributor.authorSETYANINGSIH, DESYLIA SUKMA WIDYANI
dc.date.accessioned2026-07-18T07:33:23Z
dc.date.available2026-07-18T07:33:23Z
dc.date.issued2026
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/175027
dc.description.abstractPT Pertamina Drilling Services Indonesia (PDSI) menghasilkan air limbah domestik dan laboratorium yang memerlukan pengolahan agar memenuhi baku mutu lingkungan. Penelitian bertujuan merancang Instalasi Pengolahan Air Limbah (IPAL) berdasarkan karakteristik dan debit air limbah. Metode penelitian meliputi observasi, pengumpulan data, analisis kualitas air limbah, penentuan unit pengolahan, penetapan kriteria desain, penyusunan Detail Engineering Design (DED), Bill of Quantity (BOQ), dan Rencana Anggaran Biaya (RAB). IPAL berkapasitas 14,96 m³/hari terdiri atas grease trap, ekualisasi, biofilter anaerob-aerob, sedimentasi, filtrasi, dan bak kontrol. Hasil perancangan menunjukkan efluen yang diproyeksikan memenuhi baku mutu sesuai PP Nomor 11 Tahun 2025. Estimasi biaya pembangunan IPAL sebesar Rp386.876.783 (tiga ratus delapan puluh enam juta delapan ratus tujuh puluh enam ribu tujuh ratus delapan puluh tiga rupiah).
dc.description.abstractPT Pertamina Drilling Services Indonesia (PDSI) produces domestic and laboratory wastewater that must be treated to meet environmental standards. This research aims to design a Wastewater Treatment Plant (WWTP) based on the wastewater characteristics and flow rate. The methods included field observation, data collection, wastewater quality analysis, selection of treatment units, determination of design criteria, preparation of the Detail Engineering Design (DED), Bill of Quantity (BOQ), and cost estimation. The proposed WWTP has a capacity of 14.96 m³/day and consists of a grease trap, equalization tank, anaerobic–aerobic biofilter, sedimentation unit, filtration unit, and control chamber. The design shows that the treated wastewater is expected to meet the effluent standards in PP No. 11 of 2025. The estimated construction cost of the WWTP is Rp386,876,783 (three hundred eighty-six million eight hundred seventy-six thousand seven hundred eighty-three Indonesian rupiah).
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePerancangan Instalasi Pengolahan Air Limbah Warehouse PT Pertamina Drilling Services Indonesiaid
dc.title.alternativeDesign of a Wastewater Treatment Plant for PT Pertamina Drilling Services Indonesia Warehouse
dc.typeTugas Akhir
dc.subject.keywordair limbah domestikid
dc.subject.keywordair limbah laboratoriumid
dc.subject.keywordbiofilter anaerob-aerobid
dc.subject.keyworddedid
dc.subject.keywordipalid
dc.subject.keyworddomestic wastewaterid
dc.subject.keywordlaboratory wastewaterid
dc.subject.keywordanaerobic-aerobic biofilterid
dc.subject.keyworddedid
dc.subject.keywordWWTPid
dc.subtypeUndergraduate Theses


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record