IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Environmental Engineering and Management
      • View Item
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Environmental Engineering and Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Perancangan Instalasi Pengolahan Air Limbah Warehouse PT Pertamina Drilling Services Indonesia

      Thumbnail
      View/Open
      Cover (578.6Kb)
      Fulltext (1.509Mb)
      Lampiran (2.167Mb)
      Date
      2026
      Author
      SETYANINGSIH, DESYLIA SUKMA WIDYANI
      Paramitadevi, Yudith Vega
      Metadata
      Show full item record
      Abstract
      PT Pertamina Drilling Services Indonesia (PDSI) menghasilkan air limbah domestik dan laboratorium yang memerlukan pengolahan agar memenuhi baku mutu lingkungan. Penelitian bertujuan merancang Instalasi Pengolahan Air Limbah (IPAL) berdasarkan karakteristik dan debit air limbah. Metode penelitian meliputi observasi, pengumpulan data, analisis kualitas air limbah, penentuan unit pengolahan, penetapan kriteria desain, penyusunan Detail Engineering Design (DED), Bill of Quantity (BOQ), dan Rencana Anggaran Biaya (RAB). IPAL berkapasitas 14,96 m³/hari terdiri atas grease trap, ekualisasi, biofilter anaerob-aerob, sedimentasi, filtrasi, dan bak kontrol. Hasil perancangan menunjukkan efluen yang diproyeksikan memenuhi baku mutu sesuai PP Nomor 11 Tahun 2025. Estimasi biaya pembangunan IPAL sebesar Rp386.876.783 (tiga ratus delapan puluh enam juta delapan ratus tujuh puluh enam ribu tujuh ratus delapan puluh tiga rupiah).
       
      PT Pertamina Drilling Services Indonesia (PDSI) produces domestic and laboratory wastewater that must be treated to meet environmental standards. This research aims to design a Wastewater Treatment Plant (WWTP) based on the wastewater characteristics and flow rate. The methods included field observation, data collection, wastewater quality analysis, selection of treatment units, determination of design criteria, preparation of the Detail Engineering Design (DED), Bill of Quantity (BOQ), and cost estimation. The proposed WWTP has a capacity of 14.96 m³/day and consists of a grease trap, equalization tank, anaerobic–aerobic biofilter, sedimentation unit, filtration unit, and control chamber. The design shows that the treated wastewater is expected to meet the effluent standards in PP No. 11 of 2025. The estimated construction cost of the WWTP is Rp386,876,783 (three hundred eighty-six million eight hundred seventy-six thousand seven hundred eighty-three Indonesian rupiah).
       
      URI
      http://repository.ipb.ac.id/handle/123456789/175027
      Collections
      • UF - Environmental Engineering and Management [242]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository