REDESAIN TATA LETAK RUANG CHANGES PART DENGAN METODE CORELAP BERBASIS KLASIFIKASI FSN DI PT X
Abstract
NANDA IBRANI. Redesain Tata Letak Ruang Changes Part dengan Metode
CORELAP Berbasis Klasifikasi FSN di PT X. Dibimbing oleh YANDRA
ARKEMAN.
Ruang Changes Part di PT X memiliki tata letak yang belum optimal
sehingga menyebabkan proses pencarian dan perpindahan part kurang efisien.
Penelitian ini bertujuan merancang ulang tata letak menggunakan metode
CORELAP berbasis klasifikasi FSN untuk meningkatkan efisiensi perpindahan
material dan menurunkan biaya material handling. Metode yang digunakan
meliputi Activity Relationship Chart (ARC), Total Closeness Rating (TCR),
klasifikasi FSN berdasarkan Turnover Ratio (TOR), perhitungan rectilinear
distance, weighted distance, dan Ongkos Material Handling (OMH). Hasil
penelitian menunjukkan bahwa tata letak usulan mampu menurunkan total
weighted distance dari 488,08 meter menjadi 480,64 meter atau meningkat
sebesar 1,52%. Selain itu, biaya material handling menurun dari Rp215.537 per
hari menjadi Rp206.237 per hari atau terjadi penghematan sebesar 4,31%. Tata
letak usulan juga menghasilkan aliran material yang lebih efektif serta
penempatan part yang lebih teratur berdasarkan frekuensi penggunaannya.
Kata kunci: CORELAP, FSN, OMH, layout, rectilinear NANDA IBRANI. Redesign of Changes Part Room Layout Using the CORELAP
Method Based on FSN Classification at PT X. Supervised by YANDRA
ARKEMAN.
The Changes Part room at PT X has an inefficient layout that affects part
searching and material movement activities. This study aims to redesign the
layout using the CORELAP method based on FSN classification to improve
material handling efficiency and reduce material handling costs. The methods
used include Activity Relationship Chart (ARC), Total Closeness Rating (TCR),
FSN classification based on Turnover Ratio (TOR), rectilinear distance, weighted
distance, and Material Handling Cost (OMH) analysis. The results show that the
proposed layout reduced the total weighted distance from 488.08 to 480.64 or
improved efficiency by 1.52%. In addition, material handling costs decreased
from Rp215,537 per day to Rp206,237 per day, resulting in cost savings of 4.31%.
The proposed layout also creates a more effective material flow and more
organized part placement based on usage frequency.
Keywords: CORELAP, FSN, OMH, layout, rectilinear