IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Industrial Management
      • View Item
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      PENERAPAN SISTEM PENCATATAN PADA PRODUKSI ASPAL SEBAGAI UPAYA MENDUKUNG TRACEABILITY PROSES PRODUKSI DI PT XYZ

      Thumbnail
      View/Open
      Cover (2.001Mb)
      Fulltext (9.762Mb)
      Lampiran (2.458Mb)
      Date
      2026
      Author
      ADAWIYAH, YUSNITA
      Apriliani, Fany
      Metadata
      Show full item record
      Abstract
      Pengendalian kualitas pada proses produksi Asphalt Mixing Plant (AMP) menuntut sistem pencatatan yang terintegrasi dan terstandarisasi. PT XYZ masih menghadapi permasalahan pencatatan yang terfragmentasi dan belum berfokus pada parameter kritis, sehingga menyulitkan traceability saat terjadi keluhan pelanggan. Metode Analytical Hierarchy Process (AHP) digunakan untuk menentukan tahapan paling berpengaruh terhadap mutu, dengan hasil faktor process & equipment memperoleh bobot tertinggi (0,55), khususnya pada tahapan pugmill, weighing, dan dryer. Selanjutnya, Fault Tree Analysis (FTA) mengidentifikasi akar penyebab penyimpangan pada ketiga tahapan tersebut sebagai dasar pengembangan sistem pencatatan terintegrasi. Sistem yang dihasilkan mencakup standarisasi formulir, integrasi dokumen yang sebelumnya terpisah. Dengan demikian, sistem pencatatan ini tidak hanya berfungsi sebagai alat administrasi, tetapi juga sebagai instrumen pengendalian kualitas yang mendukung traceability secara menyeluruh.
       
      Quality control in the Asphalt Mixing Plant (AMP) production process requires an integrated and standardized recording system. PT XYZ still faces problems with fragmented recordkeeping that does not yet focus on critical parameters, making traceability difficult when customer complaints occur. The Analytical Hierarchy Process (AHP) method was used to determine the production stages that have the greatest influence on quality. The results show that the process & equipment factor obtained the highest weight, at 0.55, particularly in the pugmill, weighing, and dryer stages. Furthermore, Fault Tree Analysis (FTA) was used to identify the root causes of deviations in these three stages as the basis for developing an integrated recording system. The resulting system includes standardized forms and the integration of previously separate documents. Thus, this recording system functions not only as an administrative tool, but also as a quality control instrument that supports comprehensive traceability.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/173568
      Collections
      • UF - Industrial Management [236]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository