Show simple item record

dc.contributor.advisorSuwarna, Ujang
dc.contributor.authorIrwansyah, Aditya Sandy
dc.date.accessioned2024-08-22T03:50:30Z
dc.date.available2024-08-22T03:50:30Z
dc.date.issued2024
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/158182
dc.description.abstractPenyaradan merupakan salah satu tahapan dalam pemanenan kayu. Produktivitas dan biaya penyaradan menjadi informasi yang diperlukan untuk dapat mengoptimalkan kegiatan penyaradan. Penelitian bertujuan menganalisis besarnya produktivitas dan biaya yang dikeluarkan pada kegiatan penyaradan manual kayu Acacia mangium di BKPH Parung Panjang, KPH Bogor. Truk digunakan sebagai supportive work selama proses penyaradan. Waktu kerja diukur dengan metode kumulatif dan nuls stop. Produktivitas didapatkan melalui volume kayu dan waktu kerja yang dihasilkan. Biaya didapatkan dari hasil wawancara dengan pekerja. Hasil penelitian mengelompokkan produktivitas penyaradan yang dihasilkan menjadi produktivitas efektif sebesar 3,25 m3/jam, produktivitas aktual sebesar 2,20 m3/jam, dan produktivitas standar sebesar 2,04 m3/jam. Hasil tersebut menunjukkan delay yang terjadi menurunkan produktivitas sebesar 32,31% dari produktivitas aktual. Biaya penyaradan apabila Perhutani memiliki truk sendiri yaitu Rp65.719,27/m3 sedangkan tarif upah borongan yang ditetapkan yaitu Rp71.900/m3. Berdasarkan analisis biaya tersebut, apabila Perhutani memiliki truk sendiri dapat menghemat biaya Rp6.180,73/m3. Produktivitas dan biaya penyaradan dapat dioptimalkan dengan mengurangi waktu delay yang dapat dihindari selama proses penyaradan.
dc.description.abstractSkidding is one of the stages in wood harvesting. The productivity and costs of skidding are necessary information to optimize skidding activities. The research aims to analyze the amount of productivity and costs incurred in manual skidding activities for Acacia mangium wood at BKPH Parung Panjang, KPH Bogor. Trucks are used as supportive work during the skidding process. Working time is measured by cumulative and zero stop methods. Productivity is obtained through the volume of wood and working time produced. Costs are obtained from interviews with workers. The research results grouped the resulting skidding productivity into effective productivity of 3.25 m3/hour, actual productivity of 2.20 m3/hour, and standard productivity of 2.04 m3/hour. These results show that the delay that occurred reduced productivity by 32.31% of actual productivity. The cost of skidding if Perhutani has its own truck is Rp65,719.27/m3, while the piece rate set is Rp71,900/m3. Based on this cost analysis, if Perhutani had its own trucks it could save costs of Rp6,180.73/m3. Skidding productivity and costs can be optimized by reducing avoidable delays during the skidding process.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titleProduktivitas dan Biaya Penyaradan Manual Kayu Acacia mangium di BKPH Parung Panjang KPH Bogorid
dc.title.alternativeProductivity and Costs of Acacia mangium Wood Manual Skidding at BKPH Parung Panjang KPH Bogor
dc.typeSkripsi
dc.subject.keywordakasiaid
dc.subject.keywordBiayaid
dc.subject.keywordpenyaradanid
dc.subject.keywordproduktivitasid
dc.subject.keywordwaktu kerjaid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record