Show simple item record

dc.contributor.advisorChadirin, Yudi
dc.contributor.advisorSaptomo, Satyanto Krido
dc.contributor.authorAgistania, Nadhifah
dc.date.accessioned2021-12-28T07:57:48Z
dc.date.available2021-12-28T07:57:48Z
dc.date.issued2021
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/110347
dc.description.abstractIndonesia merupakan negara beriklim tropis dengan curah hujan rata-rata yaitu antara 2.000-4.000 mm/tahun (KLH 2009). Potensi air hujan yang tinggi belum termanfaatkan secara optimal. Siklus hidrologi memegang peranan penting dalam menjaga ketersediaan air di permukaan bumi. Penelitian ini bertujuan menyusun desain penampungan air hujan, menghitung kebutuhan air domestik, dan menghitung persentase kebutuhan air domestik yang disuplai dari air hujan pada gedung kuliah baru IPB. Penelitian ini menggunakan data curah hujan harian 10 tahun terakhir, yaitu dari tahun 2010-2019 dengan acuan SNI 03-7065-2005 dan SNI 8153:2015. Hasil penelitian ini berupa Ground Water Tank (GWT) berukuran 6 x 4,5 x 4,5 x 0,3 m dengan kapasitas 121,92 m3 yang dapat memenuhi kebutuhan air gedung sebesar 78,90 %. Penelitian ini menggunakan sistem atap sebagai catchment area dari ground water tank. Debit andalan yang didapat berdasarkan luas area atap sebesar 53,65 m3. Penilaian Greenship kategori aspek konservasi air memperoleh poin sebesar 17 poin dari total 21 poin yang tersedia dengan dua tolak ukur prasyarat. Rancangan Anggaran Biaya (RAB) pembuatan ground water tank di gedung kuliah baru IPB sebesar Rp 347.905.662.id
dc.description.abstractIndonesia is a tropical country with an average rainfall of 2,000-4,000 mm/year (KLH 2009). The high potential of rainwater has not been utilized optimally. The hydrological cycle plays an important role in maintaining the availability of water on the earth's surface. This study aims to develop a rainwater storage design, calculate domestic water needs, and calculate the percentage of domestic water needs supplied from rainwater in the new IPB lecture building. This study uses daily rainfall data for the last 10 years, namely from 2010-2019 with reference to SNI 03-7065-2005 and SNI 8153:2015. The results of this study are Ground Water Tank (GWT) measuring 6 x 4,5 x 4,5 x 0.3 m with a capacity of 121,92 m3 which can meet the building's water needs of 82,90%. This study uses a roof system as a catchment area of the ground water tank. The mainstay discharge obtained based on the roof area is 53,65 m3. The Greenship assessment in the water conservation aspect category received 17 points out of a total of 21 points available with two prerequisite benchmarks. The Draft Budget (RAB) for the construction of a ground water tank in the new lecture building of IPB amounted to Rp 347.905.662.id
dc.language.isoidid
dc.publisherIPB Universityid
dc.titleRancangan Sistem Penampungan Air Hujan Pada Bangunan Hijau Di Kampus IPB Dramaga Bogorid
dc.typeUndergraduate Thesisid
dc.subject.keywordclean water needsid
dc.subject.keywordwater conservationid
dc.subject.keywordrainwater storageid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record