dc.description.abstractProyek Reklamasi Pelabuhan Belawan Paket II dilakukan untuk membangun lapangan penumpukan kontainer atau peti kemas. Fungsi tersebut didukung dengan kestabilan tanah di lokasi pelabuhan. Dari hasil uji SPT, tanah di lokasi pelabuhan tergolong tanah lunak dengan kedalaman 41 m sehingga perlu dilakukan perbaikan pada tanah tersebut agar stabil. Salah satu metode yang dapat digunakan untuk mengatasi masalah tersebut adalah metode Preloading dan Prefabricated Vertical Drain (PVD). Salah satu yang memperngaruhi efektifitas metode ini adalah kedalaman PVD. Penelitian ini bertujuan untuk mengetahui pengaruh dari pemasangan berbagai kedalaman PVD di lokasi seluas 174000 m2 Ha ini. Kedalaman PVD yang diteliti adalah 0%, 25%, 50%, 75% dan 100% dari kedalaman tanah lunak. Data yang dibutuhkan adalah rata-rata index properties tanah yang didapatkan dari uji laboratorium dengan sampel tanah dari 9 titik bor. Dari hasil perhitungan didapatkan potensi pemampatan tanah di lokasi adalah 2,4 m. Tanpa PVD, dibutuhkan waktu selama 50670 hari agar mencapai konsolidasi 90%. Sementara dengan menggunakan PVD diperlukan waktu tercepat 69 hari dengan PVD kedalaman 100% tanah lunak. Selain itu, semakin dalam PVD maka sisa pemampatan dalam 10 tahun semakin kecil. Dari variasi kedalaman Pemasangan PVD didapatkan termahal yaitu Rp14, 938 miliar dengan lama instalasi 111 hari.id
dc.description.abstractBelawan Port Reclamation Project II was carried out to build a container yard. This function is supported by soil stability at the port location. From the results of the SPT test, the soil at the port location is classified as soft soil with a depth of 41 m so it is necessary to make improvements to the soil so that it is stable. One method that can be used to overcome this problem is the Preloading and Prefabricated Vertical Drain (PVD) method. One that affects the effectiveness of this method is the depth of the PVD.This study aims to determine the effect of installing various depths of PVD in this 174000 m2 project site. The PVD depths studied were 0, 25, 50, 75, and 100% of the soft soil depth. The data needed is the average index of soil properties obtained from laboratory tests with soil samples from 9 drill points. This study shows that the potential for land subsidence at the location is 2.4 m. Without PVD, it would take 50670 days to reach 90% consolidation. While using PVD, it takes 69 days with a PVD depth of 100% soft soil. In addition, the deeper the PVD, the smaller the remaining compression in 10 years. The most expensive cost is 14,938 billion IDR with an installation time of 111 days from the variation in depth of PVD installation.id
dc.language.isoidid
dc.publisherIPB Universityid
dc.titleAnalisis Kedalaman Prefabricated Vertical Drain di Reklamasi Pelabuhan Belawan, Kota Medanid
dc.title.alternative. Analysis of Prefabricated Vertical Drain Depth in The Reclamation of Belawan Port, Medan Cityid
dc.typeUndergraduate Thesisid
dc.subject.keywordPemampatanid
dc.subject.keywordperbaikan tanahid
dc.subject.keywordPVDid
dc.subject.keywordSPTid
dc.subject.keywordtanah lunakid