Search
Now showing items 11-20 of 68
Penentuan Lokasi, Luas, dan Volume Genangan Air Sebagai Potensi Cadangan Airtanah di Perumahan Tamansari Persada, Bogor
(2013)
The changes of the green land-use as retention area to become housing area, will cause problems like enhancement of run-off, reduction of water infiltration to the land, as well as puddle and flood if water volume increases ...
Perencanaan Sistem Penyaluran Air Limbah Laboratorium di Kampus IPB Dramaga, Bogor
(2013)
Waste are emissions that resulted from an industrial production processes or domestic, that not environmentaly wanted and does not have economic value. This study aimed to determine the laboratory wastewater discharge and ...
Prediksi Potensi Cadangan Airtanah Menggunakan Persamaan Darcy di Kota Tangerang Selatan, Provinsi Banten
(2012)
Water is very important for human beings. Sources of freshwater that can be used is only 3% of the total water availability on earth. One of fresh water’s sources that can be used is groundwater. The objective of this study ...
Analisis Up Take Kandungan Logam Berat dari Kompos Lumpur Water Treatment Plant oleh Tanaman.
(2013)
Utilization of sludge processing results are very minimal and less noticed by many among the industry. This research aims to identify the feasibility of compost of sludge processing drinking water as a medium for planting, ...
Aplikasi Building Information Modeling (BIM) Menggunakan Software Tekla Structures 17 Pada Konstruksi Gedung Kuliah Tiga Lantai Fahutan IPB, Bogor
(2012)
Building Information Modeling is the process of managing building data during the construction cycle. In this research Building Information Modeling (BIM) by using Tekla Structures software version 17 was applied on a three ...
Rancangan Unit Instalasi Pengolahan Air Limbah dengan Pengolahan Biologis Attached Growth
(2013)
Industrial development in Indonesia, cause negative impact on environment, such as water pollution. One way to overcome this problem is by developing wastewater treatment plant (WWTP). However not all industries have WWTP, ...
Kajian Efektivitas Penerapan Sistem Manajemen Lingkungan ISO 14001 di PT. Indocement Tunggal Prakarsa, Tbk. Citeureup, Bogor
(2013)
PT. Indocement Tunggal Prakarsa. (ITP) Tbk. Cietureup, Bogor has implemented ISO 14001 since September 2002 and still retain such accreditation. The objective of this study was to determine the effectiveness of the ...
Analisis Stabilitas Lereng pada Model Tanggul Berbahan Tanah Gleisol
(2009)
Salah satu cara untuk mengatasi banjir dan kekeringan di Indonesia adalah dengan membangun tanggul yang berfungsi untuk melindungi daerah irigasi dari banjir yang disebabkan oleh sungai, menahan rembesan, dan menyangga ...
Optimasi Penggunaan Koagulan Terhadap Rancangan Unit Koagulasi, Flokulasi, dan Sedimentasi pada Pengolahan Air Limbah Laboratorium
(2013)
Laboratories wastewater of Bogor Agricultural University (IPB) Dramaga is one of the parties who contribute environmental pollution. Waste Water Treatment Plant (WWTP) located in front of the Veterinary Medicine Faculty ...
Analisis Rembesan dan Gaya Angkat Pada Perencanaan Bendung di Desa Sungai Buntu, Kecamatan Pedes, Karawang.
(2013)
The construction of a dam is built crossing river stream for elevating water level. In designing a dam, force field analysis in a dam is needed to ensure a dam can be operated properly. The focus of this research is to ...