Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/154086
Title: | Evaluasi Proses Supply dari Gudang Bahan ke Bagian Produksi di PT Heinz ABC Indonesia |
Other Titles: | Evaluation of the Supply Process from Material Warehouse to Production Department at PT Heinz ABC Indonesia |
Authors: | Jumiono, Aji Hendrayani, Anisa Putri |
Issue Date: | 2024 |
Publisher: | IPB University |
Abstract: | Proses supply bahan dari Bagian Gudang ke Bagian Produksi di PT Heinz
ABC Indonesia kerap terjadi delay karena tata kelola gudang masih kurang baik.
Rencana perbaikan dilakukan dengan evaluasi menggunakan Metode Define,
Measure, Analyze, Improve, and Control (DMAIC) yang bertujuan mencari akar
penyebab masalah dan saran perbaikan. Hasil analisa yang dilakukan terdapat
empat penyebab terjadinya masalah delay supply dengan masalah prioritas
berdasarkan Diagram Pareto yaitu bahan sulit ditemukan. Saran perbaikan
berdasarkan akar permasalahan yang didapat menggunakan Five Whys Analysis
yaitu memperbaiki instruksi kerja menjadi lebih sederhana sehingga dibuat
instruksi kerja perbaikan. Hasil dari evaluasi ini yaitu adanya instruksi kerja
perbaikan dapat digunakan sebagai standar baru perusahaan. The process of supplying materials from Material Warehouse to Production Department at PT Heinz ABC Indonesia is often delayed because The improvement plan is carried out by evaluating using the Define, Measure, Analyze, Improve, and Control (DMAIC) Method which aims to find the root cause of the problem and suggest appropriate improvements. The results of the analysis carried out there are four causes of delayed supply problems with priority problems based on the Pareto Diagram, namely difficult to find materials. Suggestions for improvement based on the root causes of the problem obtained using the Five Whys Analysis, namely improving work instructions to be simpler so that improved work instructions are made. The result of this evaluation is that the improvement work instruction can be used as a new company standard. |
URI: | http://repository.ipb.ac.id/handle/123456789/154086 |
Appears in Collections: | UT - Industrial Management |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
cover_J0311201074_66182e11e2e340bf99d799b4e6e16b9c.pdf | Cover | 2.72 MB | Adobe PDF | View/Open |
fulltext_J0311201074_6382c8c4354d42eba594a20b42845647.pdf Restricted Access | Fulltext | 3.27 MB | Adobe PDF | View/Open |
lampiran_J0311201074_d3f93572782b4456a0db360de7deebc4.pdf Restricted Access | Lampiran | 2.85 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.