Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/154086
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorJumiono, Aji-
dc.contributor.authorHendrayani, Anisa Putri-
dc.date.accessioned2024-07-18T01:43:13Z-
dc.date.available2024-07-18T01:43:13Z-
dc.date.issued2024-
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/154086-
dc.description.abstractProses supply bahan dari Bagian Gudang ke Bagian Produksi di PT Heinz ABC Indonesia kerap terjadi delay karena tata kelola gudang masih kurang baik. Rencana perbaikan dilakukan dengan evaluasi menggunakan Metode Define, Measure, Analyze, Improve, and Control (DMAIC) yang bertujuan mencari akar penyebab masalah dan saran perbaikan. Hasil analisa yang dilakukan terdapat empat penyebab terjadinya masalah delay supply dengan masalah prioritas berdasarkan Diagram Pareto yaitu bahan sulit ditemukan. Saran perbaikan berdasarkan akar permasalahan yang didapat menggunakan Five Whys Analysis yaitu memperbaiki instruksi kerja menjadi lebih sederhana sehingga dibuat instruksi kerja perbaikan. Hasil dari evaluasi ini yaitu adanya instruksi kerja perbaikan dapat digunakan sebagai standar baru perusahaan.-
dc.description.abstractThe process of supplying materials from Material Warehouse to Production Department at PT Heinz ABC Indonesia is often delayed because The improvement plan is carried out by evaluating using the Define, Measure, Analyze, Improve, and Control (DMAIC) Method which aims to find the root cause of the problem and suggest appropriate improvements. The results of the analysis carried out there are four causes of delayed supply problems with priority problems based on the Pareto Diagram, namely difficult to find materials. Suggestions for improvement based on the root causes of the problem obtained using the Five Whys Analysis, namely improving work instructions to be simpler so that improved work instructions are made. The result of this evaluation is that the improvement work instruction can be used as a new company standard.-
dc.description.sponsorshipnull-
dc.language.isoid-
dc.publisherIPB Universityid
dc.titleEvaluasi Proses Supply dari Gudang Bahan ke Bagian Produksi di PT Heinz ABC Indonesiaid
dc.title.alternativeEvaluation of the Supply Process from Material Warehouse to Production Department at PT Heinz ABC Indonesia-
dc.typeTugas Akhir-
dc.subject.keywordDMAICid
dc.subject.keywordDelay Supplyid
dc.subject.keywordFive Whys Analysisid
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311201074_66182e11e2e340bf99d799b4e6e16b9c.pdfCover2.72 MBAdobe PDFView/Open
fulltext_J0311201074_6382c8c4354d42eba594a20b42845647.pdf
  Restricted Access
Fulltext3.27 MBAdobe PDFView/Open
lampiran_J0311201074_d3f93572782b4456a0db360de7deebc4.pdf
  Restricted Access
Lampiran2.85 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.