IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Forestry and Environment
      • UT - Forest Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Produktivitas dan Analisis Biaya Rangkaian Penebangan dan Penyaradan Menggunakan Sampan Darat di PT Mitra Kembang Selaras Provinsi Riau

      Thumbnail
      View/Open
      Fulltext (10.04Mb)
      Date
      2016
      Author
      Hasanah, Nurfike
      Suwarna, Ujang
      Metadata
      Show full item record
      Abstract
      Kegiatan penebangan dan penyaradan pada hutan lahan gambut harus memperhatikan aspek teknis dan ekonomis untuk memenuhi produksi kayu dan keuntungan finansial perusahaan. Penelitian ini bertujuan menghitung dan membandingkan produktivitas dan biaya operasional kegiatan penebangan menggunakan alat chainsaw Husqvarna 365 dan Stihl 038 serta penyaradan menggunakan alat sampan darat yang ditarik dengan bantuan excavator Hitachi ZX 138 dan ZX 110. Hasil penelitian menunjukkan produktivitas aktual rata-rata rangkaian seluruh penebangan menggunakan chainsaw Husqvarna 365 sebesar 3.51 m3/jam, sedangkan Stihl 038 sebesar 3.17 m3/jam. Biaya operasional rata-rata rangkaian seluruh penebangan menggunakan chainsaw Husqvarna 365 sebesar Rp120 177.05/jam, sedangkan Stihl 038 sebesar Rp120 150.50/jam. Produktivitas aktual rata-rata penyaradan menggunakan excavator Hitachi ZX 138 sebesar 23.61 m3/jam, sedangkan ZX 110 sebesar 20.56 m3/jam. Biaya operasional penyaradan menggunakan excavator Hitachi ZX 138 sebesar Rp284 351.33/jam, sedangkan ZX 110 sebesar Rp275 475.33/jam.
      URI
      http://repository.ipb.ac.id/handle/123456789/84375
      Collections
      • UT - Forest Management [3212]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository