dc.contributor.advisor | Ilyas, Muhammad | |
dc.contributor.advisor | Siswandi | |
dc.contributor.author | Noor, Arpi Median Lavandi | |
dc.date.accessioned | 2016-02-22T05:48:00Z | |
dc.date.available | 2016-02-22T05:48:00Z | |
dc.date.issued | 2015 | |
dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/78507 | |
dc.description.abstract | Project scheduling is part of the project management which planning the implementation of activities in a project in a structured manner and have a clear time limitation. The linkage among activities in a project can be transformed into the form of matrix which can be analyzed by using max-plus algebraic method. This matrix will then be applied in the calculation to obtain the required solution of the project scheduling, such as the optimum time, critical path, and a time tolerance. | id |
dc.language.iso | id | id |
dc.publisher | IPB (Bogor Agricultural University) | id |
dc.subject.ddc | Mathematics | id |
dc.subject.ddc | Algebra | id |
dc.subject.ddc | Semarang-Jawa Tengah | id |
dc.title | Penjadwalan Proyek Menggunakan Metode Aljabar Max-Plus: Studi Kasus pada Pemasangan Pengolah Air PDAM Kota Semarang. | id |
dc.type | Undergraduate Thesis | id |
dc.subject.keyword | Max-Plus algebra | id |
dc.subject.keyword | project scheduling | id |
dc.subject.keyword | optimum time | id |
dc.subject.keyword | critical path | id |