Search
Now showing items 1-2 of 2
Penjadwalan Mata Pelajaran di Sekolah: Studi Kasus di SMPIT Nurul Fajar Bogor
(2015)
Scheduling is one of the problems faced by many institutions including schools. However, the conventional scheduling is often sub-optimal. In this work, the scheduling problem is modeled mathematically using integer ...
Penjadwalan Mata Kuliah Mayor-Minor: Studi Kasus di FMIPA IPB
(2013)
A curriculum called a major-minor curriculum has been used at Institut Pertanian Bogor (IPB) in the last six years. Several problems have been identified during the implementation of curriculum, one of them is related to ...