IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Industrial Management
      • View Item
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Reduksi Lead Time melalui Pendekatan Lean Manufacturing pada Sabun Bar Transparan “X” di PT XYZ Kota Bogor

      Thumbnail
      View/Open
      Cover (301.6Kb)
      Fulltext (1.310Mb)
      Lampiran (2.207Mb)
      Date
      2026
      Author
      MANDAIYA, AULIA MAIRANI
      Mulyati, Heti
      Metadata
      Show full item record
      Abstract
      Panjangnya lead time produksi sabun bar transparan "X" di PT XYZ yang melebihi standar melatarbelakangi penelitian ini. Penelitian ini bertujuan menganalisis kondisi aktual, mengidentifikasi waste, menyusun usulan perbaikan lean manufacturing pada proses extruder hingga finishing, serta menunjukkan peningkatan efisiensinya. Metode yang digunakan adalah VSM, PAM, Pareto, 5 Whys, One Piece Flow, dan line balancing. Hasil menunjukkan Process Cycle Efficiency (PCE) awal hanya 34,86% dengan lead time 61 jam 5 menit 30 detik akibat dominasi waste waiting time (90,6%) dalam sistem batch flow. Usulan perbaikan dilakukan dengan mengubah sistem menjadi One Piece Flow (per box), menggabungkan stasiun extruder dan cutting, menambah mesin stamping, serta merekayasa transportasi box. Hasilnya, lead time tereduksi menjadi 18 jam 2 menit 38 detik dan PCE meningkat signifikan sebesar 37,23% menjadi 72,09%, Penelitian ini membuktikan transisi ke One Piece Flow efektif mereduksi lead time dan meningkatkan efisiensi.
       
      The excessive production lead time of transparent bar soap "X" at PT XYZ serves as the background for this study. This research aims to analyze actual conditions, identify wastes, propose lean manufacturing improvements from the extruder to finishing, and demonstrate its efficiency enhancement. Methods used include VSM, PAM, Pareto, 5 Whys, one-piece flow, and line balancing. Results showed the initial PCE was only 34.86%, with a lead time of 61 hours 5 minutes 30 seconds due to dominant waiting time waste (90,6%) in the batch flow system. The proposed improvement shifts the system to a one-piece flow (per box), combine extruder and cutting stations, adds a stamping machine, and re-engineers box transportation. Consequently, lead time reduced to 18 hours 2 minutes 38 seconds, and PCE increased significantly by 37,23% to 72,09%. This study proves that transitioning to a one-piece flow effectively reduces lead time and enhances efficiency.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/175712
      Collections
      • UF - Industrial Management [339]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository