IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Industrial Management
      • View Item
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Vocational School
      • UF - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Perbaikan Tata Letak dan Penanganan Bahan untuk Meningkatkan Efisiensi Proses Produksi Batu Warna di PT Tatalogam Lestari

      Thumbnail
      View/Open
      Cover (544.5Kb)
      Fulltext (1.244Mb)
      Lampiran (817.3Kb)
      Date
      2026
      Author
      NUGRAHA, FAJAR WISNU
      Santosa, Sesar Husen
      Damayanthy, Dessy
      Metadata
      Show full item record
      Abstract
      Penelitian ini dilaksanakan di PT Tatalogam Lestari. PT Tatalogam Lestari bergerak di bidang infrastruktur dengan fokus pada produksi genteng metal dan baja ringan. Penelitian ini bertujuan untuk mengetahui upaya dalam meningkatkan efisiensi tata letak dan biaya penanganan bahan dengan menggunakan metode Activity Relationship Chart (ARC), Total Closeness Rating (TCR) dengan dibantu perangkat lunak berupa Blocplan dan AutoCad serta One Point Lesson untuk meningkatkan efektivitas pada proses pembuatan batu warna. Hasil analisis yang dilakukan menunjukkan penurunan total jarak perpindahan material dari 30.019,18 meter menjadi 27.057,64 meter atau lebih efisien sebesar 9,87%. Selain itu, mengurangi biaya perpindahan material yang sebelumnya Rp1.395.846,49 menjadi Rp1.155.276,42 atau lebih efisien sebesar 17,23%. Hal ini menunjukkan tata letak usulan mampu menurunkan jarak pemindahan material dan menurunkan biaya penanganan material.
       
      This research was carried out at PT Tatalogam Lestari. PT Tatalogam Lestari is engaged in infrastructure with a focus on the production of metal and light steel tiles. This study aims to determine efforts to improve the efficiency of the layout and material handling costs by using the Activity Relationship Chart (ARC) method, Total Closeness Rating (TCR) with the assistance of software in the form of Blocplan and AutoCad as well as One Point Lesson to increase the effectiveness of the color stone manufacturing process. The results of the analysis showed a decrease in the total material displacement distance from 30.019,18 meters to 27.057,64 meters or more efficiently by 9.87%. In addition, reducing the cost of moving materials from IDR 1.395.846,49 to IDR 1.155.276,42 or more efficient by 17.23%. This shows that the proposed layout is able to reduce the distance of material transfer and reduce material handling costs.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/174521
      Collections
      • UF - Industrial Management [299]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository