| dc.contributor.advisor | Rahmawati, Novia | |
| dc.contributor.author | D, Hawa Mustika Galvanizahra | |
| dc.date.accessioned | 2026-07-08T05:42:42Z | |
| dc.date.available | 2026-07-08T05:42:42Z | |
| dc.date.issued | 2026 | |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/174218 | |
| dc.description.abstract | PT XYZ memproduksi minuman dalam kemasan menggunakan mesin filling
hot fill Yuhfeng HTST yang beroperasi sejak 2008. Nilai OEE mesin filling produk
X 200ML periode Juli-Desember 2025 rata-rata sebesar 63,28%, di bawah standar
world class 85%, dengan performance rate sebagai komponen terendah rata-rata
77,42%. Penelitian ini bertujuan menganalisis OEE dan Six Big Losses,
mengidentifikasi faktor dominan penyebab rendahnya performance rate, serta
menyusun rekomendasi perbaikan menggunakan Diagram Pareto, fishbone, 5 Why,
dan PDCA. Hasil analisis menunjukkan Reduced Speed Losses (RSL) merupakan
kerugian dominan rata-rata 32,75% yang disebabkan fluktuasi suhu PHE sterilizer
akibat valve CPM aus karena tidak adanya jadwal Preventive Maintenance baku.
Rekomendasi perbaikan meliputi penggantian valve CPM, penetapan jadwal PM
bulanan, One Point Lesson (OPL), dan Checksheet PM. Proyeksi menunjukkan
availability rate meningkat dari 81,95% menjadi 89,45%, performance rate dari
77,42% menjadi 85,00%, dan OEE dari 63,28% menjadi 75,53% atau naik sebesar
12,25%. | |
| dc.description.abstract | PT XYZ produces bottled beverages using a Yuhfeng HTST hot fill machine
operating since 2008. The OEE of the filling machine for product X 200ML during
July-December 2025 averaged 63.28%, below the 85% world class standard, with
performance rate as the lowest component at 77.42%. This study aimed to analyze
OEE and Six Big Losses, identify the dominant factor causing low performance
rate, and develop improvement recommendations using Pareto Diagram, fishbone,
5 Why, and PDCA. Results showed that Reduced Speed Losses (RSL) was the
dominant loss at 32.75%, caused by PHE sterilizer temperature fluctuations due to
worn Constant Pressure Modulating (CPM) valve from lack of a standardized
Preventive Maintenance schedule. Recommendations include CPM valve
replacement, monthly PM scheduling, One Point Lesson (OPL), and PM
Checksheet. Projections indicate availability rate increasing from 81.95% to
89.45%, performance rate from 74.42% to 85.00%, and OEE from 63.28% to
75.53%, a 12.25% improvement. | |
| dc.description.sponsorship | | |
| dc.language.iso | id | |
| dc.publisher | IPB University | id |
| dc.title | Optimalisasi Performance Rate Mesin Filling Berdasarkan Analisis Six Big Losses Untuk Meningkatkan OEE di PT XYZ | id |
| dc.title.alternative | | |
| dc.type | Tugas Akhir | |
| dc.subject.keyword | filling hot fill | id |
| dc.subject.keyword | OEE | id |
| dc.subject.keyword | performance rate | id |
| dc.subject.keyword | phe sterilzer | id |
| dc.subject.keyword | Six Big Losses | id |
| dc.subtype | Undergraduate Theses | |