View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analisis Perencanaan Produksi Karton Box Adidas SPW 40 Melalui Pendekatan Logika Fuzzy di PT Cipta Multi Buana Perkasa

      Thumbnail
      View/Open
      Cover (573.4Kb)
      Fulltext (1.938Mb)
      Lampiran (1016.Kb)
      Date
      2025
      Author
      Subakti, Muhammad Fikri
      Yusri, Doni
      Metadata
      Show full item record
      Abstract
      MUHAMMAD FIKRI SUBAKTI. Analisis Perencanaan Produksi Karton Box Adidas SPW 40 Melalui Pendekatan Logika Fuzzy di PT Cipta Multi Buana Perkasa. Dibimbing oleh DONI YUSRI. Penelitian ini menganalisis dan mengevaluasi perencanaan produksi di PT Cipta Multi Buana Perkasa melalui metode kuantitatif. Berdasarkan data historis dan pengamatan, perusahaan mengalami permasahalan stockout dan overstock. Hal ini dikarenakan tidak adanya metode perencaan yang melibatkan variabel bahan baku dan finished good. Perusahaan merencanakan produksi berdasarkan permintaan dan data historis saja, serta tidak memiliki tetapan Safety Stock yang baku. Penelitian ini menyarankan penggunaan metode perhitungan perencanaan produksi dan pengendalian produksi seacara kuantitatif. Dimulai dari perhitungan Safety Stock & ROP, peramalan memakai Time Series, metode fuzzy, perencanaan agregat, Master Production Schedule (MPS), dan Material Requirement Planning (MRP). Hasil dari perhitungan berdasarkan metode yang telah disebutkan diharapkan dapat mengatasi permasalahan yang timbul di perusahaan, serta meningkatkan efisiensi operasional.
       
      MUHAMMAD FIKRI SUBAKTI. Analysis of Adidas SPW 40 Carton Box Production Planning Using a Fuzzy Logic Approach at PT Cipta Multi Buana Perkasa. Supervised by DONI YUSRI. This research analyzes and evaluates production planning at PT Cipta Multi Buana Perkasa using quantitative methods. Based on historical data and observations, the company experienced stockout and overstock problems. This is because there is no planning method that involves raw material and finished goods variables. The company plans production based on demand and historical data only, and does not have standard Safety Stock settings. This research suggests the use of quantitative production planning and production control calculation methods. Starting from calculating Safety Stock & ROP, Forecasting using Time Series, fuzzy methods, aggregate planning, Master Production Schedule (MPS), and Material Requirement Planning (MRP). The results of calculations based on the methods mentioned are expected to be able to overcome problems that arise in the company, as well as increase operational efficiency
       
      URI
      http://repository.ipb.ac.id/handle/123456789/164656
      Collections
      • UT - Industrial Management [219]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository