Show simple item record

dc.contributor.advisorAziezah, Nur
dc.contributor.advisorBarus, Irma Rasita Gloria
dc.contributor.authorAlwahdi, Muhammad Abdullah
dc.date.accessioned2024-09-03T01:30:06Z
dc.date.available2024-09-03T01:30:06Z
dc.date.issued2024
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/158532
dc.description.abstractDepartemen produksi AL4, merupakan departemen yang berada di PT Amerta Indah Otsuka yang masih mengalami kendala saat penyajian laporan karena pencatatan informasi supplies masih dilakukan secara manual. Dalam upaya meningkatkan efisiensi, departemen AL4 mengembangkan dan menerapkan sistem monitoring supplies berbasis website. Setelah implementasi sistem, evaluasi tingkat kepuasan pengguna sistem dilakukan menggunakan metode PIECES (Performance, Information, Economy, Control, Efficiency, Service). Tujuan dari penelitian ini adalah untuk mengevaluasi sistem monitoring supplies yang digunakan di Departemen Produksi AL4 PT Amerta Indah Otsuka, mengukur seberapa baik sistem dalam memenuhi kebutuhan pengguna dengan fokus khusus pada tingkat kepuasan pengguna. Hasil penelitian didapatkan bahwa dari enam variabel yang dimiliki oleh metode PIECES memiliki rata-rata yaitu performance 4.07, information 4.12, economy 4.15, control 4.25, efficiency 4.15, services 4.19. Dengan tingkat kepuasan pengguna terhadap sistem moitoring supplies masuk dalam kategori puas.
dc.description.abstractThe AL4 production department is a department at PT Amerta Indah Otsuka which is still experiencing problems when presenting reports because recording supplies information is still done manually. In an effort to increase efficiency, the AL4 department developed and implemented a website-based supplies monitoring system. After system implementation, evaluation of system user satisfaction levels is carried out using the PIECES (Performance, Information, Economy, Control, Efficiency, Service) method. The purpose of this research is to evaluate the supplies monitoring system used in the AL4 Production Department of PT Amerta Indah Otsuka, measuring how well the system meets user needs with a special focus on the level of user satisfaction. The research results showed that the average of the six variables owned by the PIECES method was performance 4.07, information 4.12, economy 4.15, control 4.25, efficiency 4.15, services 4.19. The level of user satisfaction with the supplies monitoring system is in the satisfied category.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titleEvaluasi Sistem Monitoring Supplies Menggunakan Metode PIECES di Departemen Produksi AL4 PT Amerta Indah Otsukaid
dc.title.alternativeEvaluation of the Supplies Monitoring System Using the PIECES Method in the AL4 Production Department at PT Amerta Indah Otsuka
dc.typeTugas Akhir
dc.subject.keywordPiecesid
dc.subject.keywordmanualid
dc.subject.keywordmonitoring suppliesid
dc.subject.keywordwebsiteid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record