Show simple item record

dc.contributor.advisorRidwan, Wonny Ahmad
dc.contributor.authorSudrajat, Mitha Hafizhah
dc.date.accessioned2024-08-10T03:36:27Z
dc.date.available2024-08-10T03:36:27Z
dc.date.issued2024
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/157013
dc.description.abstractGedung Komatsu Marketing and Support Indonesia (KMSI) merupakan gedung perkantoran yang memiliki terdiri dari 3 (tiga) lantai serta atap dan 144 karyawan. Gedung KMSI membutuhkan debit air ±15,55 m3/hari untuk flushing toilet. Penelitian ini untuk merancang sistem plambing agar penyediaan air untuk flushing toilet di Gedung KMSI tidak menggunakan air yang berasal dari PAM JAYA melainkan dari air hasil olahan IPAL. Sistem penyediaan air hasil olahan IPAL menggunakan sistem tangki atap dengan sistem pengaliran ke bawah dan dilengkapi pompa pendorong. Kapasitas tangki atas direncanakan berkapasitas 0,5 m3 dan kapasitas tangki bawah 7 m3. Pompa untuk menyalurkan air dari tangki bawah menuju tangki atas menggunakan pompa centrifugal berkapasitas 3 m3/jam dengan daya 0,37 kW. Dimensi pipa yang direncanakan menggunakan PVC 0,5 inci pada pipa menuju tangki gelontor WC, PVC 0,75-1,25 inci pada pipa vertikal setiap lantai, dan PVC 1,5 inci pada pipa horizontal. Total Rencana Anggaran Biaya untuk perancangan sistem plambing ini sebesar Rp 53.749.370,00 (Lima Puluh Tiga Juta Tujuh Ratus Empat Puluh Sembilan Ribu Tiga Ratus Tujuh Puluh Rupiah).
dc.description.abstractThe Komatsu Marketing and Support Indonesia (KMSI) building is an office building consisting of 3 (three) floors as well as a rooftop and 144 employees. The KMSI building requires a water flow of ±15.55 m3/day for flushing toilets. This research is to design a plumbing system so that the water supply for flushing toilets in the KMSI Building does not use water from PAM JAYA but from water processed by IPAL. The water supply system processed by the IPAL uses a roof tank system with a downward flow system and is equipped with a booster pump. The upper tank capacity is planned to be 0,5 m3and the lower tank capacity is 7 m3. The pump to distribute water from the lower tank to the upper tank uses a centrifugal pump with a capacity of 3 m3 /hour with a power of 0,37 kW. The planned pipe dimensions use 0,5 inch PVC on the pipe to the toilet flush tank, PVC 0,75-1,25 inch on the vertical pipe on each floor, and PVC 1,5 inch on the horizontal pipe. The total budget plan for designing this plumbing system is IDR 53.749.370,00 (Fifty Three Million Seven Hundred Forty Nine Thousand Three Hundred Seventy Rupiah).
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePerancangan Sistem Plambing Air Hasil Olahan IPAL untuk Flushing Toilet Gedung KMSI di PT United Tractors Tbkid
dc.title.alternativeDesign of IPAL Processed Water Plumbing System for Flushing Toilet of KMSI Building at PT United Tractors Tbk
dc.typeTugas Akhir
dc.subject.keywordipalid
dc.subject.keywordwater recyclingid
dc.subject.keywordplumbing systemid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record