Show simple item record

dc.contributor.advisorHuda, Achmad Syamsul
dc.contributor.authorFiqr, Muhammad Raushan
dc.date.accessioned2024-07-29T04:16:40Z
dc.date.available2024-07-29T04:16:40Z
dc.date.issued2024
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/154979
dc.description.abstractMUHAMMAD RAUSHAN FIQR. Penerapan Total Productive Maitenance Pada Mesin Filling di PT Bintang Toedjoe Pulogadung Dibimbing oleh ACHMAD SYAMSUL HUDA. Mesin Unifill pada area filling liquid menunjukan data selama bulan Agustus, September, Oktober, dan November. Pada bulan Agustus terdapat downtime sebesar 16,82%. Pada bulan September terdapat downtime sebesar 16,05%. Pada bulan Oktober terdapat downtime sebesar 12,66%. Pada bulan November terdapat downtime sebesar 18,04%. Grafik ini menunjukan informasi tentang jumlah tidak efektif pada mesin filling liquid. Breakdown yang tinggi mengakibatkan penurunan line efficiency. Kondisi seperti ini, dikarenakan mesin beroperasi selama 2 shift pada setiap bulan, sehingga untuk mengatasi hal tersebut perlu adanya perhatian dengan melakukan maintenance dengan menerapkan Total Productive Maintenance (TPM). Solusi yang dilakukan untuk menurunkan breakdown pada proses filling liquid dengan pembuatan one point lesson. One point lesson merupakan pengetahuan dasar yang dibuat untuk memfasilitasi operator terhadap penggantian pisau potong mesin filling. Dengan melakukan penerapan penggantian pisau secara teratur dan menggunakan jenis pisau yang sesuai, perusahaan dapat menurunkan angka breakdown secara efektif Kata kunci: downtime, Overall Equipment Effectiveness, One Point Lesson, pisau potong
dc.description.abstractThe Unifill machine in the liquid filling area shows data for August, September, October and November. In August there was downtime of 16.82%. In September there was downtime of 16.05%. In October there was downtime of 12.66%. In November there was downtime of 18.04%. This graph shows information about the amount of ineffectiveness in liquid filling machines. High breakdown results in decreased line efficiency. Conditions like this are because the machine operates for 2 shifts every month, so to overcome this, attention is needed by carrying out maintenance by implementing Total Productive Maintenance (TPM). The solution is to reduce breakdown in the liquid filling process by creating a one point lesson. One Point Lesson is basic knowledge created to facilitate operators in replacing filling machine cutting knives. By implementing regular knife replacement and using the appropriate type of knife, companies can reduce breakdown rates effectively.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titlePenerapan Total Productive Maitenance Pada Mesin Filling di PT Bintang Toedjoe Pulogadungid
dc.title.alternativeApplication Total Productive Maintenance on Filling Machines at PT Bintang Toedjoe Pulogadung
dc.typeTugas Akhir
dc.subject.keywordDowntimeid
dc.subject.keywordOverall equipment effectivenessid
dc.subject.keywordOne Point Lessonid
dc.subject.keywordCutting knivesid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record