Show simple item record

dc.contributor.advisorIndrawan, Purana
dc.contributor.authorPratama, Igo oktavian
dc.date.accessioned2024-07-23T06:21:15Z
dc.date.available2024-07-23T06:21:15Z
dc.date.issued2024
dc.identifier.urihttp://repository.ipb.ac.id/handle/123456789/154593
dc.description.abstractIGO OKTAVIAN PRATAMA Evaluasi waktu baku Proses Join Cuffs Kemeja Koko dengan Metode Stopwatch di CV Suho Garmindo. Dibimbing oleh PURANA INDRAWAN. Proses produksi adalah kegiatan penting untuk mencapai target perusahaan dan memastikan kelancaran operasional. Ketidaksesuaian antara target harian dan jumlah produk yang dihasilkan serta penumpukan bahan baku pada proses join cuffs dapat berdampak buruk pada perusahaan. Hal ini bertujuan meningkatkan produktivitas dan mengoptimalkan waktu kerja proses join cuffs dengan menganalisis studi gerakan, ekonomi gerakan, dan perhitungan waktu baku. Perhitungan waktu baku dilakukan menggunakan metode stopwatch, dipilih karena pekerjaan bersifat berulang dan dilakukan oleh satu operator. Data pengamatan dengan stopwatch diseragamkan menggunakan batas kendali atas (BKA) dan batas kendali bawah (BKB), diuji kecukupannya, dan dihitung waktu bakunya dengan memasukkan faktor penyesuaian dan kelonggaran. Hasilnya adalah waktu siklus 125,56 detik, waktu normal 146,90 detik dengan faktor penyesuaian 1,17, dan waktu baku 176,28 detik dengan kelonggaran 20%. Berdasarkan perhitungan ini, kemampuan operator adalah 160 pasang manset/hari
dc.description.abstractIGO OKTAVIAN PRATAMA. Evaluation Of Standard Time For Joining Process Of Cuffs Of Koko Shirt Using Stopwatch Method At Cv Suho Garmindo. Supervised by PURANA INDRAWAN. The production process is crucial for achieving company targets and ensuring smooth operations. Discrepancies between daily targets and the number of products produced, as well as the accumulation of raw materials in the join cuffs process, can negatively impact the company. This research aims to increase productivity and optimize the working time of the join cuffs process by analyzing motion studies, motion economy, and calculating standard time. The standard time calculation is performed using the stopwatch method, chosen because the task is repetitive and performed by a single operator. Observation data collected with a stopwatch are standardized using upper control limits (UCL) and lower control limits (LCL), tested for sufficiency, and the standard time is calculated by incorporating adjustment and allowance factors. The results show a cycle time of 125.56 seconds, a normal time of 146.90 seconds with an adjustment factor of 1,17, and a standard time of 176.28 seconds with an allowance of 20%. Based on these calculations, the operator's capability is 160 pairs of cuffs/ day.
dc.description.sponsorship
dc.language.isoid
dc.publisherIPB Universityid
dc.titleEvaluasi Waktu Baku Proses Join Cuff Kemeja Koko dengan Metode Stopwatch di CV Suho Garmindoid
dc.title.alternative
dc.typeTugas Akhir
dc.subject.keywordStandard Timeid
dc.subject.keywordmotion economyid
dc.subject.keywordjoin cuffid
dc.subject.keywordmotion studyid


Files in this item

Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record