View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Vocational School
      • UT - Industrial Management
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Penurunan Downtime Hours Mesin Bossar pada Area Filling Pouch Line B di PT. XYZ

      Thumbnail
      View/Open
      Cover (2.491Mb)
      Fulltext (3.707Mb)
      Lampiran (2.086Mb)
      Date
      2024
      Author
      Salsabila
      Kartinawati, Annisa
      Metadata
      Show full item record
      Abstract
      SALSABILA. Penurunan Downtime Hours Mesin Bossar Pada Area Filling Pouch Line B di PT XYZ. Dibimbing oleh ANNISA KARTINAWATI. Area produksi KKM kemasan pouch di PT XYZ mengalami kendala signifikan dalam proses filling, yaitu seringnya proses terhenti akibat breakdown pada mesin Bossar, yang mengakibatkan tingginya downtime hours di area filling pouch. Dengan melakukan analisis SMART dan metode PDSA sebagai kerangka kerja yang terstruktur dan terukur. Proyek bertujuan untuk mengidentifikasi faktor penyebab terjadinya peningkatan downtime hours dan memberikan alternatif solusi untuk menurunkan downtime hours pada mesin Bossar di area filling pouch line B PT XYZ. Alternatif solusi yang dilakukan untuk menurunkan downtime hours pada proses filling kremer kental manis kemasan pouch line B dengan pembuatan formulir check sheet CILA yang berisi kolom Cleaning, Inspection, Lubrication & Adjusting (CILA) pada 16 part item pengecekan mesin Bossar. Rancangan solusi ini melibatkan perhitungan penentuan rata-rata waktu ketika mesin tidak beroperasi (Mean Downtime) dan Overall Equipment Effectiveness (OEE) sebagai indikator keberhasilan Total Productive Maintenance (TPM).
       
      SALSABILA. Reduction of Downtime Hours for Bossar Machines in Filling Pouch Line B at PT XYZ. Supervised by ANNISA KARTINAWATI. The pouch packaging production area at PT XYZ faces a significant challenge in the filling process, namely frequent interruptions due to breakdowns in the Bossar machines, resulting in high downtime hours in the pouch filling area. By conducting SMART analysis and utilizing the PDSA method as a structured and measurable framework, the project aims to identify the root causes of increased downtime hours and provide alternative solutions to reduce downtime hours on Bossar machines in the pouch filling line B at PT XYZ. The alternative solution implemented to reduce downtime hours in the filling process for sweetened condensed milk pouch packaging line B involves creating a CILA check sheet form containing columns for Cleaning, Inspection, Lubrication & Adjusting (CILA) for 16 machine check items on the Bossar machines. This solution design involves calculating the average time when the machines are not in operation (Mean Downtime) and Overall Equipment Effectiveness (OEE) as an indicator of Total Productive Maintenance (TPM) success.
       
      URI
      http://repository.ipb.ac.id/handle/123456789/154150
      Collections
      • UT - Industrial Management [219]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository