IPB University Logo

SCIENTIFIC REPOSITORY

IPB University Scientific Repository collects, disseminates, and provides persistent and reliable access to the research and scholarship of faculty, staff, and students at IPB University

AI Repository
 
Building and Categories


      View Item 
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Faculty of Agricultural Technology
      • UF - Agroindustrial Technology
      • View Item
      •   IPB Repository
      • Final Assignments
      • Undergraduate Final Assignments
      • UF - Faculty of Agricultural Technology
      • UF - Agroindustrial Technology
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Sistem Penunjang Keputusan Penjadwalan Transportasi Angkut Tebu (Studi Kasus PG Rajawali II Unit Jatitujuh Majalengka)

      Thumbnail
      View/Open
      fulltext (2.728Mb)
      Abstract (471.7Kb)
      BAB I (397.9Kb)
      BAB II (966.7Kb)
      BAB III (673.5Kb)
      BAB IV (1.308Mb)
      BAB V (481.0Kb)
      COVER (293.4Kb)
      DAFTAR PUSTAKA (483.9Kb)
      LAMPIRAN (728.3Kb)
      Date
      2012
      Author
      Harison, Ginanjar Ilyas
      Machfud
      Metadata
      Show full item record
      Abstract
      One problem that happened in production’s process at PG Rajawali II Unit Jatitujuh is that total of sugar cane the company could get after sugar cane has been cut off is not the same with the logging plan that has been made. Transportation scheduling program CaneTrans made to decrease the amount of idle time of sugar cane and truck when sugar cane transportation from plantation to factory is being progress. Transportation scheduling and the total of truck needs is the output that CaneTrans resulted and it is updated everyday based on logging plan. Times, distances of plantation to factory, and weather used as variables which can influence the result of transportation schedule program. Total of the needs of truck is the best result of the truck needs that adapted with the result of transportation scheduling. To get more valid transportation schedule, queuing analyze has been done at unloading station. The results of the analysis shows that the queuing model formed at station A is M:M:1:FCFS:F with 58 minute of queuing time and queuing model at station B is M:M:1:FCFS:I with 48 minutes of queuing time. Efficiency for the average of sugar cane that can be transported by each truck is increased after compare result of the program with the actual data on May 25th, 27th, 29th, and 31st, the efficiency is resulted 114,19%, 102,8%, 104,1%, and 113,26% where all of sugar cane that has been planned to transported from plantation to factory can be taken with fewer of total of the truck needs than the actual data.
      URI
      http://repository.ipb.ac.id/handle/123456789/60427
      Collections
      • UF - Agroindustrial Technology [4453]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository