Title: Analisis Kinerja Waktu dan Pemodelan 3D Pada Proyek Pembangunan Jembatan Cikujang di Kabupaten Tasikmalaya
Authors: Raimadoya, Machmud Arifin
Azra, Rafdi
Keywords: Bogor Agricultural University (IPB)
time performance
project management
critical path method
3D modeling
Issue Date: 2013
Abstract: Project management is one of important part of the construction activities. By project management, contractor can manage existing resources appropriately. One part of the project management is time performance management, time management can be done using barchart, S-curve, and so on. There are several methods that really help in time management, one of them is the Critical Path Method (CPM). This study was to determine the time performance of a bridge construction project using the critical path method and perform 3D modeling. This research was conducted in the Cikujang bridge construction project in Tasikmalaya District. Based on the comparison of realization schedules and plans schedule, in general the project was running smoothly and completed earlier than planned. However, at week 26th there was a slight delay, this is due to a disturbance at mobilizing material. This delay was solved by additional actions working hours
URI: http://repository.ipb.ac.id/handle/123456789/65175
Appears in Collections:UT - Civil and Environmental Engineering

Files in This Item:
File SizeFormat 
F13raz.pdf
  Restricted Access
4.04 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.