Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/53002
Title: Analisis Beban Kerja pada Proses Pembuatan Crankcase dan Penerapan TBP untuk Memprediksi Cost Reduction di PT. Toyota Motor Manufacturing Indonesia
Authors: Herodian, Sam
Hatmadji, Albertus
Indra, Aqmarina
Keywords: Toyota Business Practice
Cost Reduction
resin material
workload
Bogor Agricultural University (IPB)
Issue Date: 2011
Abstract: Toyota Business Practice is a way to apply the Toyota Way clearly at work everyday with the basic concept is a method to solve the problem. Toyota Business Practice consists of 8 steps, there are problem clarification, breakdown analysis, target setting, root cause analysis, countermeasures, see countermeasures through, evaluation, Standardization. Toyota Business Practice used to analyze the Cost Reduction activities. By using analysis of Toyota Business Practice found that the interior and electrical section is a major section of CR less with specification resin material for supplier Sugity. Based on the analysis known that to get the CR affected by materials and processes (manufacturing). In the workload analysis, for measurement by measuring heart rate during calibration step test and work. Measurements were done in CC 2TR and CC 1TR. In the measurement of operator CC 2TR taken four subjects, whereas operator CC 1TR taken two subjects. The first, measurements of heart rate during the calibration step test and the values obtained Increase Ratio of Heart Rate and Work Energy Cost-step test. Second, heart rate measurements were taken while working to get the value of Work Energy Cost and Total Energy Cost. From the measurement results obtained subject A, B, D (at 07:30-12:00) including categories of workload being, (at 12:30-16:00) heavy workload categories. On measurements during the month of Ramadhan for subjects C, E, F (at 07:30-12:00) including categories of workload being, subject C (at 12:30-16:00) category workload is very heavy-weight, subjects E, F categories of workload being.
URI: http://repository.ipb.ac.id/handle/123456789/53002
Appears in Collections:UT - Agricultural and Biosystem Engineering

Files in This Item:
File Description SizeFormat 
Abstract.pdf
  Restricted Access
Abstract305.2 kBAdobe PDFView/Open
BAB I Pendahuluan.pdf
  Restricted Access
Bab I312.01 kBAdobe PDFView/Open
BAB II Profil Perusahaan.pdf
  Restricted Access
Bab II373.63 kBAdobe PDFView/Open
BAB III Tinjauan Pustaka.pdf
  Restricted Access
Bab III519.19 kBAdobe PDFView/Open
BAB IV Metodologi.pdf
  Restricted Access
Bab IV616.28 kBAdobe PDFView/Open
BAB V Hasil dan Pembahasan.pdf
  Restricted Access
Bab V3.45 MBAdobe PDFView/Open
BAB VI Kesimpulan.pdf
  Restricted Access
Bab VI307.7 kBAdobe PDFView/Open
BAB VII Rekomendasi.pdf
  Restricted Access
Bab VII302.59 kBAdobe PDFView/Open
Cover.pdf
  Restricted Access
Cover313.84 kBAdobe PDFView/Open
Daftar Pustaka.pdf
  Restricted Access
Daftar Pustaka306.53 kBAdobe PDFView/Open
F11ain.pdf
  Restricted Access
Full text7.72 MBAdobe PDFView/Open
Lampiran.pdf
  Restricted Access
Lampiran3.97 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.