Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/51183
Title: Analisis kebutuhan air dan head loss pada distribusi air bersih di Kampus IPB Darmaga Bogor
Other Titles: Analysis of clean water required and head loss at water distrisbution in IPB Darmaga Campus Bogor
Authors: Erizal
Sutoyo
Apriyanto, Budi
Keywords: water required
water distribution
water supply
peak time
WTP
head loss
Issue Date: 2011
Publisher: Bogor Agricultural University (IPB)
Abstract: The objectives of this study were to find clean water needs for campus IPB Darmaga, to know the peak time water consumption in IPB Darmaga, to calculate the amount of head loss and leakage that occurred in the distribution network as well as the general condition of the water supply in IPB Darmaga. Water requirement was calculated by monitoring actual water usage on the main supply meter, in order to get the daily usage and peak time usage. Furthermore, the head loss was calculated using Darcy-Weisbach and Bernoulli equations. The prediction results showed that the academic community of IPB needs clean water 2,670.84 m3/day, while the actual use of clean water could reach 3,566.62 m3/day. This signifies the use of water in the IPB is very large when compared to standard needs. The total production capacity of clean water in IPB was 4,471.75 m3/day consisting of 903.60 m3/day from Water Treatment Plant (WTP) 1 Ciapus, 1,319 m3/day from WTP 2 Ciapus, and 2,249.15 m3/day from WTP Cihideung. Peak time of water use in IPB occurred at 09.00 until 10.00 am with the highest consumption could reach 137 m3/hour. Water leaks that occur in distribution channels Fahutan tower was 88-90 liters/hour or 64.80 m3/day. While the magnitude of head loss that occurred in the pipeline transmission from WTP Cihideung toward the Fahutan tower was 14 m and elevation difference between the two places was 41 m. Pump head that occurred was 55 m.
URI: http://repository.ipb.ac.id/handle/123456789/51183
Appears in Collections:UT - Agricultural and Biosystem Engineering

Files in This Item:
File Description SizeFormat 
F11bap.pdf
  Restricted Access
Full Text3.4 MBAdobe PDFView/Open
F11bap_Cover.pdf
  Restricted Access
Cover294.95 kBAdobe PDFView/Open
F11bap_Abstract.pdf
  Restricted Access
Abstract306.75 kBAdobe PDFView/Open
F11bap_BAB I Pendahuluan.pdf
  Restricted Access
BAB I335.79 kBAdobe PDFView/Open
F11bap_BAB II Tinjauan Pustaka.pdf
  Restricted Access
BAB II646.64 kBAdobe PDFView/Open
F11bap_BAB III Metode Penelitian.pdf
  Restricted Access
BAB III462.7 kBAdobe PDFView/Open
F11bap_BAB IV Hasil dan Pembahasan.pdf
  Restricted Access
BAB IV2.44 MBAdobe PDFView/Open
F11bap_Kesimpulan.pdf
  Restricted Access
Kesimpulan330.44 kBAdobe PDFView/Open
F11bap_Daftar Pustaka.pdf
  Restricted Access
Daftar Pustaka353.96 kBAdobe PDFView/Open
F11bap_Lampiran.pdf
  Restricted Access
Lampiran1.23 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.