View Item 
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Agricultural and Biosystem Engineering
      • View Item
      •   IPB Repository
      • Dissertations and Theses
      • Undergraduate Theses
      • UT - Faculty of Agricultural Technology
      • UT - Agricultural and Biosystem Engineering
      • View Item
      JavaScript is disabled for your browser. Some features of this site may not work without it.

      Analisis kebutuhan air dan head loss pada distribusi air bersih di Kampus IPB Darmaga Bogor

      Thumbnail
      View/Open
      Full Text (3.316Mb)
      Cover (294.9Kb)
      Abstract (306.7Kb)
      BAB I (335.7Kb)
      BAB II (646.6Kb)
      BAB III (462.6Kb)
      BAB IV (2.387Mb)
      Kesimpulan (330.4Kb)
      Daftar Pustaka (353.9Kb)
      Lampiran (1.198Mb)
      Date
      2011
      Author
      Apriyanto, Budi
      Erizal
      Sutoyo
      Metadata
      Show full item record
      Abstract
      The objectives of this study were to find clean water needs for campus IPB Darmaga, to know the peak time water consumption in IPB Darmaga, to calculate the amount of head loss and leakage that occurred in the distribution network as well as the general condition of the water supply in IPB Darmaga. Water requirement was calculated by monitoring actual water usage on the main supply meter, in order to get the daily usage and peak time usage. Furthermore, the head loss was calculated using Darcy-Weisbach and Bernoulli equations. The prediction results showed that the academic community of IPB needs clean water 2,670.84 m3/day, while the actual use of clean water could reach 3,566.62 m3/day. This signifies the use of water in the IPB is very large when compared to standard needs. The total production capacity of clean water in IPB was 4,471.75 m3/day consisting of 903.60 m3/day from Water Treatment Plant (WTP) 1 Ciapus, 1,319 m3/day from WTP 2 Ciapus, and 2,249.15 m3/day from WTP Cihideung. Peak time of water use in IPB occurred at 09.00 until 10.00 am with the highest consumption could reach 137 m3/hour. Water leaks that occur in distribution channels Fahutan tower was 88-90 liters/hour or 64.80 m3/day. While the magnitude of head loss that occurred in the pipeline transmission from WTP Cihideung toward the Fahutan tower was 14 m and elevation difference between the two places was 41 m. Pump head that occurred was 55 m.
      URI
      http://repository.ipb.ac.id/handle/123456789/51183
      Collections
      • UT - Agricultural and Biosystem Engineering [3593]

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository
        

       

      Browse

      All of IPB RepositoryCollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

      My Account

      Login

      Application

      google store

      Copyright © 2020 Library of IPB University
      All rights reserved
      Contact Us | Send Feedback
      Indonesia DSpace Group 
      IPB University Scientific Repository
      UIN Syarif Hidayatullah Institutional Repository
      Universitas Jember Digital Repository