Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/164129Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Sinaga, Antonya Rumondang | - |
| dc.contributor.author | Carolina, Agatha | - |
| dc.date.accessioned | 2025-07-08T01:40:03Z | - |
| dc.date.available | 2025-07-08T01:40:03Z | - |
| dc.date.issued | 2025 | - |
| dc.identifier.uri | http://repository.ipb.ac.id/handle/123456789/164129 | - |
| dc.description.abstract | PT Yudhistira Ghalia Indonesia merupakan industri cetak offset dengan produksi utama buku pendidikan. Tingginya permintaan akan kebutuhan buku pendidikan dari seluruh pelosok negeri serta misi perusahaan untuk berkonstribusi menumbuhkan pendidikan, memerlukan sistem produksi yang efisien dan fleksibel. Dari data pengamatan yang diperoleh, ditemukan permasalahan berupa tingginya waktu tunggu pada proses produksi cetak web. Waktu tunggu tersebut didominasi dengan waktu setup mesin sebesar 46,91%. Setelah dilakukan pengamatan lebih lanjut, tidak hanya ditemukan kelonggaran, namun juga trouble yang terjadi selama setup. Dari analisa tersebut, dilakukan efisiensi serta standarisasi dengan metode Single Minutes Exchange of Dies dan penetapan waktu baku/standar baru agar didapat estimasi persiapan yang tepat untuk memperhitungkan waktu produksi serta mampu meningkatkan produktifitas mesin. Diberikan alternatif solusi berupa pengadaan dashboard interaktif dan sistem pelaporan harian dengan formulir online untuk memberikan insight data yang tepat. | - |
| dc.description.abstract | PT Yudhistira Ghalia Indonesia is an offset printing industry with the main production of educational books. The high demand for educational books from all corners of the country as well as the company's mission to contribute to growing education, requires an efficient and flexible production system. From the observation data obtained, a problem was found in the form of high waiting time in the web printing production process. The waiting time is dominated by the machine setup time of 46.91%. After further observation, not only was there slack found, but also trouble that occurred during setup. From this analysis, efficiency and standardization are carried out using the Single Minutes Exchange of Dies method and the establishment of a new standard time in order to obtain the right preparation estimate to calculate production time and be able to increase machine productivity. Alternative solutions are provided in the form of interactive dashboards and daily reporting systems with online forms to provide the right data insight. | - |
| dc.description.sponsorship | null | - |
| dc.language.iso | id | - |
| dc.publisher | IPB University | id |
| dc.title | Pengukuran Waktu Baku Proses Setup Solna D388 dengan Single Minutes Exchange of Dies di PT Yudhistira Ghalia Indonesia | id |
| dc.title.alternative | Standard Time Measurement of the Solna D388 Setup Process Using Single Minute Exchange of Dies at PT Yudhistira Ghalia Indonesia | - |
| dc.type | Tugas Akhir | - |
| dc.subject.keyword | production efficiency | id |
| dc.subject.keyword | interactive dashboard | id |
| dc.subject.keyword | machine setup time | id |
| dc.subject.keyword | process standarization | id |
| dc.subject.keyword | single minutes exchange of dies | id |
| Appears in Collections: | UT - Industrial Management | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| cover_J0311211226_c745b2a0ae6046f8a3d7cbf5a65ce908.pdf | Cover | 860.36 kB | Adobe PDF | View/Open |
| fulltext_J0311211226_db300bddde4b42f59f52618f8b3eafa6.pdf Restricted Access | Fulltext | 2.15 MB | Adobe PDF | View/Open |
| lampiran_J0311211226_5c7d93064dff4780ae3c168209f4d277.pdf Restricted Access | Lampiran | 367.69 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.