Please use this identifier to cite or link to this item: http://repository.ipb.ac.id/handle/123456789/161029
Title: EVALUASI WAKTU BAKU PROSES PRODUKSI CUP TO FRAME PADA PRODUK TIPE BR5472S DI PT XYZ
Other Titles: 
Authors: Apriliani, Fany
Fermanto, Raffly Andreana
Issue Date: 2025
Publisher: IPB University
Abstract: PT XYZ adalah industri garmen dengan produk berkualitas ekspor. Permasalahan utama yang sering terjadi adalah terkait dengan proses sewing, khususnya dalam tahap cup to frame. Proses produksi cup to frame yaitu tahap penggabunga komponen frame dengan komponen cup. Dalam proses produksi cup to frame ditemui adanya ketidaksesuaian produksi. Ketidaksesuaian yang terjadi mencakup perbedaan antara target yang ditetapkan perusahaan dan jumlah produk yang berhasil dihasilkan. Gap antara target perusahaan dengan hasil produksi aktual sebesar 50,7%. Penulis melakukan evaluasi dan perbaikan terhadap waktu baku proses cup to frame menggunakan metode stopwatch. Evaluasi yang dilakukan meliputi waktu siklus, waktu normal, dan waktu baku pada proses jahit cup to frame. Hasil dari penelitian ini menghasilkan SOP dan perbaikan terhadap metode jahit yang pada akhirnya menambah jumlah output yang dihasilkan
PT XYZ is a garment company that produces export-quality product. A major issue frequently encountered is related to the sewing process, specifically in the cup-toframe stage. The cup-to-frame production process involves the assembly of the frame component with the cup component. Discrepancies in the cup-to-frame production process have been observed. These discrepancies include differences between the company's target and the actual number of products produced. The gap between the company's target and the actual production output is 50.7%. The author conducted an evaluation and improvement of the standard time for the cupto-frame process using the stopwatch method. The evaluation included cycle time, normal time, and standard time for the cup-to-frame sewing process. The results of this study led to the development of an standard operating procedures and improvements in the sewing method, ultimately increasing the output quantity
URI: http://repository.ipb.ac.id/handle/123456789/161029
Appears in Collections:UT - Industrial Management

Files in This Item:
File Description SizeFormat 
cover_J0311201002_505b12c3f0584ac9b3c0a69052cb3a0b.pdfCover1.36 MBAdobe PDFView/Open
fulltext_J0311201002_27baf98f654a44ed9880a042572d95b6.pdf
  Restricted Access
Fulltext1.54 MBAdobe PDFView/Open
lampiran_J0311201002_9d9a454b227f47dc818834a1927ee5d3.pdf
  Restricted Access
Lampiran1.03 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.