Please use this identifier to cite or link to this item:
http://repository.ipb.ac.id/handle/123456789/154979| Title: | Penerapan Total Productive Maitenance Pada Mesin Filling di PT Bintang Toedjoe Pulogadung |
| Other Titles: | Application Total Productive Maintenance on Filling Machines at PT Bintang Toedjoe Pulogadung |
| Authors: | Huda, Achmad Syamsul Fiqr, Muhammad Raushan |
| Issue Date: | 2024 |
| Publisher: | IPB University |
| Abstract: | MUHAMMAD RAUSHAN FIQR. Penerapan Total Productive Maitenance Pada
Mesin Filling di PT Bintang Toedjoe Pulogadung Dibimbing oleh ACHMAD
SYAMSUL HUDA.
Mesin Unifill pada area filling liquid menunjukan data selama bulan Agustus,
September, Oktober, dan November. Pada bulan Agustus terdapat downtime
sebesar 16,82%. Pada bulan September terdapat downtime sebesar 16,05%. Pada
bulan Oktober terdapat downtime sebesar 12,66%. Pada bulan November terdapat
downtime sebesar 18,04%. Grafik ini menunjukan informasi tentang jumlah tidak
efektif pada mesin filling liquid. Breakdown yang tinggi mengakibatkan penurunan
line efficiency. Kondisi seperti ini, dikarenakan mesin beroperasi selama 2 shift
pada setiap bulan, sehingga untuk mengatasi hal tersebut perlu adanya perhatian
dengan melakukan maintenance dengan menerapkan Total Productive
Maintenance (TPM). Solusi yang dilakukan untuk menurunkan breakdown pada
proses filling liquid dengan pembuatan one point lesson. One point lesson
merupakan pengetahuan dasar yang dibuat untuk memfasilitasi operator terhadap
penggantian pisau potong mesin filling. Dengan melakukan penerapan penggantian
pisau secara teratur dan menggunakan jenis pisau yang sesuai, perusahaan dapat
menurunkan angka breakdown secara efektif
Kata kunci: downtime, Overall Equipment Effectiveness, One Point Lesson, pisau
potong The Unifill machine in the liquid filling area shows data for August, September, October and November. In August there was downtime of 16.82%. In September there was downtime of 16.05%. In October there was downtime of 12.66%. In November there was downtime of 18.04%. This graph shows information about the amount of ineffectiveness in liquid filling machines. High breakdown results in decreased line efficiency. Conditions like this are because the machine operates for 2 shifts every month, so to overcome this, attention is needed by carrying out maintenance by implementing Total Productive Maintenance (TPM). The solution is to reduce breakdown in the liquid filling process by creating a one point lesson. One Point Lesson is basic knowledge created to facilitate operators in replacing filling machine cutting knives. By implementing regular knife replacement and using the appropriate type of knife, companies can reduce breakdown rates effectively. |
| URI: | http://repository.ipb.ac.id/handle/123456789/154979 |
| Appears in Collections: | UT - Industrial Management |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| cover_J0311201175_101d7da4e676476ab51ec33e4a8350f2.pdf | Cover | 317.11 kB | Adobe PDF | View/Open |
| fulltext_J0311201175_0d5f2a81e0b042e695043fb86d180cd7.pdf Restricted Access | Fulltext | 1.17 MB | Adobe PDF | View/Open |
| lampiran_J0311201175_9a837904600e4a608d9b65d5bc2d45bf.pdf Restricted Access | Lampiran | 1.04 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.