Studi gerak dan waktu pada kegiatan produksi air minum dalam kemasan (AMDK) di PT Krakatau Daya Tirta, Cilegon
Abstract
Krakatau Daya Tirta is a company that engaged in the provision of packaged drinking water (AMDK). Every company wants to increase productivity to obtain high profits, therefore, the use of time and labor movement must be efficient and effective. Cycle of time that used by workers of production of packaged drinking water (AMDK) at the beginning and end of shift is different. The activity to put the AMDK 240 ml cup into the cardboard was using standard time at 37.96 seconds. The activity of cardboard assembly and final packaging process was using standard time at 38.485 seconds. The activity to pre-wash gallon 1, 2, 3, and 4 used standard time in the early shift at 6.92; 24.13; 7.92; and 48.31 seconds. According to Body Nordic questionnaire, workers put the cup into the cardboard and pre-wash workers having pain in them limbs after doing the work. Therefore, these activities work postures were analyzed by Rapid Upper Limb Assessment (RULA) method to determine the risk level of injury to the body.